LFR Inc.
<br /> 18 October 2003 - Site Specific Health and Safety Plan for the California Integrated
<br /> Waste Management Board during the Tracy Tire Fire Site Remediation Project
<br /> (prepared by SBES)
<br /> 19 October 27, 2003 - Third Quarter 2003 Quarterly Monitoring Report, Tracy Tire
<br /> Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 20 January 30, 2004 - Combined Fourth Quarter and Annual 2003 Groundwater
<br /> Monitoring Report, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy,
<br /> California
<br /> 21 February 23, 2004 - Soil Characterization Sampling Results for Burn Pile Areas
<br /> 16, 20, 21, and the Southeast Staging Area, Tracy Tire Fire Site, Former Royster
<br /> Tire Facility, Tracy, California
<br /> 22 April 28, 2004 - Soil Characterization Sampling Results for Burn Pile Areas 22
<br /> through 27, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 23 April 30, 2004 - First Quarter 2004, Groundwater Monitoring Report, Tracy Tire
<br /> Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 24 July 26, 2004 - Soil Characterization Sampling Results for Burn Pile Areas 28
<br /> through 34, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 25 July 30, 2004 - Second Quarter 2004, Groundwater Monitoring Report, Tracy
<br /> Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 26 October 29, 2004 - Third Quarter 2004, Groundwater Monitoring Report, Tracy
<br /> Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 27 December 8, 2004 - Soil Characterization Sampling Results for Burn Pile Areas
<br /> 13, 15, 17, 18, and 19, Tracy Tire Fire Site, Former Royster Tire Facility,
<br /> Tracy, California
<br /> 28 December 8, 2004 - Determination of Background Concentrations of Metals in
<br /> Soil, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 29 January 18, 2005 - Combined Fourth Quarter and Annual 2004 Groundwater
<br /> Monitoring Report, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy,
<br /> California
<br /> 30 January 21, 2005 - Field Screening and Laboratory Analytical Results for the
<br /> Lead-Affected Soil Area, Tracy Tire Fire Site, San Joaquin County, California
<br /> 31 March 14, 2005 - Soil Characterization Sampling Results for Burn Pile Areas 7
<br /> through 12, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> 32 May 12, 2005 - Soil Characterization Sampling Results for Burn Pile Areas 1
<br /> through 6 and the North Slope, Tracy Tire Fire Site, Former Royster Tire
<br /> Facility, Tracy, California
<br /> 33 July 20, 2005 - Revised Determination of Background Concentrations of Metals
<br /> in Soil, Tracy Tire Fire Site, Former Royster Tire Facility, Tracy California
<br /> 34 July 20, 2005 - Second Quarter 2005 Groundwater Monitoring Report, Tracy
<br /> Tire Fire Site, Former Royster Tire Facility, Tracy, California
<br /> rpt-RA_summ-Nov06-final-09025 Page 7
<br />
|