Laserfiche WebLink
*-*4 Mr.Nuel Henderson <br /> Page 2 of 4 <br /> generally flowed towards the northeast. Groundwater monitoring data are summarized in Table 1. <br /> Monitoring data sheets and well construction details are included in Attachment A. <br /> Hydrogen Peroxide Injection Long Term Pilot Test <br /> Ground Zero, in conjunction with Del Tech Geotechnical Services, Inc. (Del Tech), initiated the <br /> hydrogen peroxide (11202) injection pilot test on November 19, 2010. On November 12, 2010, <br /> prior to the initial H2O2 injection event, plain water was pumped into vapor extraction wells <br /> VWl, VW2 and VW6 to test each wells capacity to accept the upcoming injections. The results <br /> ` were favorable. <br /> Initial Injections <br /> Between November 19, 2010 and December 6, 2010 Ground Zero and Del Tech technicians <br /> injected approximately 715 gallons of H2O2 into well VWl, 502 gallons of H2O2 into well VW2 <br /> and 630 gallons of H2O2 into well VW6. During each injection a dilute solution of H2O2 was <br /> gravity-injected into wells VWl, VW2 and VW6. The H2O2 solution was followed by an injection <br /> of water to force the H2O2 solution into the formation. The strength of the H2O2 during the initial <br /> injection events ranged from 2.0% to 5.8%. Subsequent injection events were conducted by the <br /> Ground Zero technician on January 24, 2011 and February 8 and 9, 2011. Results were reported <br /> in the Semi-Annual Groundwater Sampling and Peroxide Injection Report dated Marcy 10, 2011. <br /> Second Quarter 2011 Injections <br /> During the second quarter of 2011 H2O2 injection events were conducted by Ground Zero on <br /> March 31, May 4, June 1 and June 27 2011. During each event, a total of approximately 220 - <br /> 225 gallons of 4.8% peroxide solution was gravity fed into the injection wells. Peroxide <br /> injection was followed by a clear water flush of 55 gallons per well to force the peroxide further <br /> ` into the formation. <br /> A summary of the H2O2 injection history has been included in Table 2. Field are included in <br /> ` Attachment A. <br /> ` Groundwater Performance Sampling <br /> Per the Monitoring and Reporting Program, on March 28, 2011, a Ground Zero technician <br /> collected groundwater samples from injection wells VWl and VW2 and on May 17, 2011 a <br /> Ground Zero technician collected groundwater samples from transition zone monitoring wells <br /> MW2, MW5 and MW13B and from injection wells VW1 and VW2. A minimum of three well <br /> .. casing volumes was purged from each well prior to sampling. During the purging process, <br /> physical parameters [pH, electrical conductivity (EC), dissolved oxygen (DO), oxidation <br /> reduction potential (ORP), and temperature] were monitored. Subsequent to parameter <br /> stabilization, and appropriate recovery of initial depth to groundwater measurements, <br /> groundwater samples were collected using dedicated disposable bailers. The groundwater <br /> samples were placed into the appropriate containers, checked for headspace, uniquely labeled, <br /> placed into an ice chest cooled to approximately 4°C, and transported to Argon Laboratories <br /> (FLAP #2359), under chain of custody protocol, for analysis. <br /> r:\GROUNDZEIROEK\REPORTS1Peroxide RIM Test\Rcports12Q1R2011 Remedial Progess Report.doc <br /> V <br />