Laserfiche WebLink
Cal✓EPA U ` <br /> IPJ: S9 Pete Wilson <br /> State Water June 4, 1998 Governor <br /> Resources <br /> Control Board <br /> Division of Carl Knowles <br /> Clean Water Harold Knowles <br /> Programs 1140 Hammer Ln W <br /> Stockton, CA 95209 <br /> Mailing Address: <br /> P.O.Box 944212 <br /> Sacramento,CA <br /> 94244-2120 PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 7881, <br /> 2014 T Street, SITE ADDRESS: 102 WILSON WAY S, STOCKTON, CA 95205 <br /> Suite 130 <br /> Sacramento,CA I have reviewed your request,received on June 2, 1998, for pre-approval of corrective action costs. <br /> (916) With the following provisions,the total cost pre-approved for continuing an additional six months of <br /> (916)227-6010 g P p pp <br /> FAX(916)227-4530 operating the existing vapor extraction system and completing one year of quarterly groundwater <br /> World wide web monitoring and sampling is $42,338; see the table below for a breakdown of costs. Upon completion <br /> http://www.swrcb.ca. of each phase of work,you are required to submit the results to the County and the Fund for reviews. <br /> gov/—cwphome/ Note: You need to attach a copy of the directive letter(s) from the County to all pre-approval requests <br /> fundhome.htm made to the Fund; missing documentation can cause a delay �in processing g your requests. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter. <br /> AU future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Com]en <br /> ffSystem <br /> Vapor Extraction 21,679 includes project ment, <br /> hermox)For equipment, matenalytical through 12 testing, Thermoxand permit, <br /> and operational <br /> reporting. <br /> Quarterly Groundwater 20,659 includes project ment, <br /> Monitoring and Sampling of equipment, mateport <br /> 13 Wells From Fourth Quarter preparation, purgr disposal,of 1998 Through Third and laboratory a (TPHg,uarter of 1999 BTEX, MtBE, anenates). <br /> TOTAL PRE-APPROVED $42,338 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> r?�.• Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> rC� ensure their proper allocation and efcient use for the benefit of present and future generations. <br />