Laserfiche WebLink
_� <br /> C¢UEPA � j.`.;'C rl Pete Wilson <br /> August 5, 1997 Governor <br /> State Water <br /> Resources <br /> Control Board Mr. Carl Knowles <br /> 1140 Hammer LnW. <br /> W. <br /> Division of Stockton,CA 95209 <br /> Clean Water <br /> Programs <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS,CLAIM NO. 7881, <br /> Mailing Address: <br /> P.O.Box 944212 SITE ADDRESS: 102 WILSON WAY S,STOCKTON,CA 95205 <br /> Sacramento,CA <br /> 94244-2120 I have reviewed your request,received on July 24, 1997,for pre-approval of corrective action costs;I will <br /> 2014 r street, place these documents in your file for future reference. I have included a copy of the"Cost Pre-Approval <br /> sa trite 1 o0CA Request"form;please use this form in the future for requesting pre-approval of corrective actions costs. <br /> 95814 <br /> (916)2274374 With the following provisions,the total cost pre-approved as eligible for reimbursement for completing the <br /> FAX(916)227-0530 <br /> Soil and Purge Water Disposal,is$4,615;see the table below for a breakdown of costs. (The total amount <br /> World Wide Web approved for reimbursement through Request No. 1 for work at your site that has been directed and approved <br /> http://www.swrcb.ca. <br /> govhcwphome/ by the County is$8,544.) <br /> fundhome.htm <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursementper the terms ofyour Letter of Commitment at costs consistent with those pre-approved in <br /> this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> Sampling Stockpile 431 <br /> Profiling,Manifesting,Loading, 1777 30 tons of soil <br /> Hauling and Disposal of <br /> Stockpile <br /> Pur a Water Disposal 2407 1980 gallons of soil <br /> TOTAL PRE-APPROVED 54,615 I j <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to remain <br /> valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work;the Fund's three bid <br /> requirement is waived for this scope of work. <br /> 4Our mission is to preserve and enhance the quality of California's water resources,and <br /> %04 Recycled Paper ensure their proper allocation and efficient use for the benefit ofpresent andfuture generations. <br />