Laserfiche WebLink
Mar-07=95 10 : 49 GroumZero Inc-JMP 41581 -5416 P . 04 <br /> s <br /> The soil borings/monitoring wells proposed in our previously <br /> submitted workplan and in this addendum will be performed by May <br /> 12, 1995. The feasibility studies proposed above will be performed <br /> by the end of the second quarter 1995, and a corrective action plan <br /> will be prepared and submitted to you for review by the end of the <br /> third quarter of 1995 as required by you in your letter dated <br /> February 15, 1995. If the UST fund is unable to review and approve <br /> our workplan by March 31 , 1995 the schedules outlined above may be <br /> delayed accordingly. <br /> All work at the site will be performed according to the previously <br /> submitted QA/QC plan and health and safety plan submitted with the <br /> Mill Creek Associates workplan. <br /> Please call if you have any questions regarding this response and <br /> workplan addendum. <br /> Sincerely, <br /> Ground `Zero Analysis, Inc. <br /> eus <br /> / /l _ 2 � cn M <br /> . Power r ��� aC <br /> Project Manager N� <br /> GREGORY P. <br /> 4 STAHL <br /> _,t,�w— No. 5023 <br /> Gregory P. Stahl lgTF g�R <br /> CA Registered Geologist No. 5023 OFCA0 <br /> cc: Mr. Carl Knowles <br /> Mr. David Isola-Riddle & Isola <br /> Ms. Elizabeth Thayer-Regional Water Quality Control Board <br /> Ms. Karna Herrigfeld-Neumiller & Beardslee <br /> Mr. George Lockwood-Underground Storage Tank Clean-Up Fund <br />