Laserfiche WebLink
Harold and Dena Knowles ..or <br /> 102 S.Wilson Way <br /> Page 2 of 2 <br /> feasibility study (FS) should be prepared for the site to address impacted groundwater <br /> onsite, primarily in the source area, to reduce the dissolved mass and to minimize off-site <br /> migration of contaminants. Submit the CAP or FS to the EHD by 03 January 2007. <br /> For your information, at this time the site toward the west, 101 S. Wilson Way, is <br /> conducting both SVE and groundwater extraction, while the site toward the south, 130 S. <br /> Wilson Way, is addressing impacted groundwater through ozone injection. <br /> Questions or comments may be directed to the undersigned at (209) 468-3436 or by <br /> mail (address on the letterhead). <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Nuel C. Henderson, Jr., PG Margaro REHS <br /> Engineering Geologist Program Coordinator, Unit IV <br /> Unit IV <br /> C: James L.L. Barton - CVRWQCB <br /> Gregory Stahl — GZA <br /> Mohammid Asghar <br /> Tasnim Akhtar <br />