My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 11:01:28 AM
Creation date
7/22/2020 10:49:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knowles Family 1993 Revocable Trust -2- June 10, 2002 <br /> ❑ A complete copy of the Request for Bids (RFB) and a list of all firms invited to bid. It is <br /> strongly recommended that the RFB include a"fill-in-the-blanks" Bid Form identifying all <br /> major tasks of the proposed work along with the following minimum cost breakdown items <br /> for each task: <br /> ♦ List of all staff/worker classifications and hourly rates of each to be utilized. <br /> ♦ The number of hours to be utilized by each staff/worker <br /> ♦ Subcontractor costs <br /> ♦ Equipment costs <br /> ♦ Itemized listing of estimated ancillary/incidental costs <br /> ❑ Complete copies of all bids and other correspondence received in response to the RFB. <br /> All cost proposals should include the completed cost proposal breakdown, with task subtotals <br /> and a grand total cost for the entire scope of work. <br /> If you need assistance in procuring contractor and consultant services or if you have any <br /> questions, don't hesitate to call me. I can be reached at(916) 341-5796. <br /> Sincerely, <br /> 96,—a-2-- <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Rebecca Setliff <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, P Floor <br /> Stockton, CA 95202-2708 <br /> Gregory P. Stahl <br /> Ground Zero Analysis, Inc. <br /> 1714 Main Street <br /> Escalon, CA 95320-1927 <br /> California Eu rironmental Protecbrau Ageney <br /> Zr1 Recyc/edPape, <br />
The URL can be used to link to this page
Your browser does not support the video tag.