My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012190
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:23:34 PM
Creation date
7/22/2020 11:28:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012190
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> I 16 maintenance of the VES typically includes daily site inspections the first five days of <br /> operation and weekly site visits the first month of operation <br /> ' Typical APCD guidelines during <br /> the startup phase require the collection of influent and <br /> effluent air samples from the VES on a daily basis for the first three days of operation to demonstrate system efficiency, and every two weeks thereafter for the next month After the <br /> initial startup phase, sample collection may be reduced to once every month for the life of <br /> the remediation project, at the discretion of the APCD <br /> 5.5 System Operations, Maintenance and Compliance Monitoring and Reporting <br /> I <br /> After startup and source testing, the APCD will likely require site visits a minimum of once <br /> per month for the life of the project Modifications to this schedule would be made if <br /> additional requirements are specified by the guidelines set forth by the APCD in the <br /> ATC/PTO Remediation status reports should be prepared for submittal to the County and <br /> the APCD on a quarterly basis or the frequency specified in the PTO <br /> ' Site operations and monitoring should include adjustment of system parameters to optimize <br /> VES extraction and treatment, and thus site cleanup efficiency, periodic sampling and field <br /> monitoring of influent and effluent as required by the APCD, and other periodic maintenance <br /> procedures including inspection and cleaning of all lines, process equipment, and <br /> instrumentation Parameters to be monitored and adjusted in the field should include vapor <br /> extraction flow rates, induced vacuum responses at on site wells, and hydrocarbon vapor <br /> concentrations <br /> i <br /> If at any time laboratory analytical results or field monitoring readings show air emission <br /> limits to be exceeded, a confirmation air sample should be collected in accordance with <br /> APCD permit guidelines <br /> 5.6 Confirmation Soil Borings <br /> Following the indicated completion of vapor extraction, Ground Zero proposes to drill <br /> confirmation borings adjacent to soil borings SB-24 SB-25 <br /> J , SB-26, SB-29, and into the <br /> former tank cavity to collect confirmation samples from depths summarized on Table 5 Soil <br /> samples will be collected from the confirmation borings within the depth intervals specified <br /> in Table 5 at 5 foot intervals and analyzed for TPHg and BTEX using EPA Methods <br /> 8015/8020 <br /> 5.7 Fate and Transport Model <br /> � if a significant volume of gasoline hydrocarbons remains in the soil after best available <br /> technology has been demonstrated to provide no additional benefit then fate and transport <br /> model will be prepared to provide an indication of future impact <br /> ' zroundwltmk\cap 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.