Laserfiche WebLink
6ErrtER-RYAN IN c. GR Job # 1820- 1786 <br /> D. Results of Testing/Servicing SWRCB,January 2006 <br /> Software Version Installed: 329 . 01 <br /> Complete the following checklist: <br /> E] es ❑ o Is the audible alarm operational? <br /> ❑ Yes [3 No* Is the visual alarm operational? <br /> El Yes [3 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> jj Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> 0 Yes [I No* If alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> N/A <br /> 0 Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> 0 Sumpfrrench Sensor; 0 Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? E Yes; ❑ No. <br /> Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? .25 % <br /> Yes No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) Product, ❑water If <br /> yes,describe causes in Section E,below. <br /> 0 Yes No Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> 10 Yes No` Is all monitoring equipment operational per manufacture's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12/07 <br />