Ron Rowe Project 805678 <br /> February 28, 2000 <br /> Page 3 <br /> Task 2 Groundwater Monitoring Well Installation <br /> Three on-site groundwater monitoring wells (MW-1, MW-2, and MW-3) are proposed to <br /> be installed at the locations presented on Figure 2. Exact well locations will be based upon <br /> access and utility locations. <br /> The exploratory borings for will be advanced to a total depth of approximately 60 feet bgs <br /> (depending on subsurface drilling conditions) using 10-inch-diameter hollow stern auger <br /> drilling equipment. Anticipated depth to water is approximately 45 feet bgs. ;r� <br /> Soil samples will be collected at five-foot intervals using a 4-inch diameter modified <br /> California split spoon sampler. Sampling equipment will be washed in an alconox solution <br /> and rinsed to reduce potential cross contamination. The field geologist will prepare <br /> exploratory boring logs from soil samples consistent with the Unified Soil Classification kk <br /> System. Soil samples will be field-screened by conducting headspace analysis using a � <br /> portable photoionization detector (PID). Soil samples will be preserved by sealing the X41, � <br /> sample liners with Teflon tape and plastic end caps. Samples will be labeled with respect <br /> to site, boring designation, and depth, and placed in a cooler with ice pending selection for <br /> laboratory analysis. <br /> The borings will be converted to 4-inch-diameter groundwater monitoring wells <br /> constructed with Schedule 40 polyvinyl chloride (PVC) casing. The screen intervals will <br /> consist of approximately 30 feet of 0.02-inch slotted casing placed at approximately 30 to <br /> 60 feet bgs. Number 3 sand will be used for the filter pack and placed to approximately 2 �tJ <br /> feet above the well screen. A transitional bentonite seal approximately 3 feet thick will be 4 <br /> placed above the filter pack. The remaining annulus will be sealed to within 1. foot of <br /> ground surface with cement grout placed through tremie pipe. A traffic rated vault boxf1R� <br /> will be installed flush with surface grade for well head protection. A licensed surveyor <br /> will be contracted to survey the location of the wells with respect to mean sea level. <br /> Exploratory boring and well installation procedures are presented in Appendix A. <br /> Soil cuttings generated during drilling will be stockpiled on-site on plastic sheeting and <br /> sampled for disposal profiling. Following disposal profiling, the stockpile will be hauled <br /> off-site by a qualified contractor and disposed of at the proper facility. <br /> After well installation is completed, IT will develop the wells and llect groundwater <br /> samples. Development methods will include a combination of ur bailing, and <br /> pumping to remove sediments from the well. <br /> Sac1N:�CamPk\Data\Archive\Arco\.54691Reports15469p103.doe-951Jsg;1 IT Corporation <br /> 02/28/00 <br />