My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:58:54 PM
Creation date
7/22/2020 1:55:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure IMPORTANT:Remove all chips and shavings generated <br /> " in steps 3 thru 5 out of the cut end of the tube. DO NOT <br /> remove chips and shavings by dumping thru valve <br /> body. <br /> Mark Upper Tube <br /> (Cut Line) STEP 4: FILE THE UPPER DROP TUBE <br /> File the upper tube square,and remove any burrs or <br /> Seam <br /> Figure 2 rough edges. Make sure the cut is flat and square. <br /> IMPORTANT:Carefully file a good chamfer on the in- <br /> STEP 3: CUT THE UPPER DROP TUBE side edge of the drop tube to provide a lead-in for the <br /> Attach the supplied band clamp to the upper tube just polypak seal and inlet tube installed in Step 8. <br /> below the mark and ensure that it is assembled square <br /> to the tube. The clamp can be used as a guide for mak- <br /> ing a square cut. If a vise is used,clamp on the valve <br /> body casting only to avoid damage to the float and <br /> tubes (See Figure 3A). Carefully saw through the tube <br /> squarely,at the mark made in Step 2. Use a hacksaw <br /> with anew fine-tooth blade. Rotating the upper tube <br /> as the sawing progresses will minimize run out and en- <br /> sure a square 90-degree cut. Remove the band clamp <br /> after tube is cut. <br /> CAUTION-DO NOT use a pipe or tubing cutter to cut <br /> the upper drop tube,this may damage the tube, Fine half round file <br /> causing it to be out of round thereby prohibiting <br /> assembly of the unit. <br /> Figure 4 <br /> STEP 5: SAND THE UPPER DROP TUBE <br /> Sand the inside of the drop tube with sandpaper and/or <br /> steel wool to remove all burrs and sharp edges. After <br /> �., sanding wipe down the inside of the tube with a clean <br /> rag from the top to approximately 4 inches down to <br /> remove any debris. <br /> Caution: Failure to properly chamfer,sand,and <br /> \ _ / clean the drop tube may cut the seal and result in a <br /> failure of a pressure decay leak test. <br /> i <br /> Figure 3A i <br /> Band Clamp <br /> Fine grit sandpaper <br /> Cut Line Figure 5 <br /> Figure 38 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.