My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOEING
>
2518
>
2200 - Hazardous Waste Program
>
PR0538472
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 1:41:04 PM
Creation date
7/22/2020 2:11:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0538472
PE
2220
FACILITY_ID
FA0014398
FACILITY_NAME
QUEST INDUSTRIES LLC
STREET_NUMBER
2518
Direction
E
STREET_NAME
BOEING
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-3937
CURRENT_STATUS
01
SITE_LOCATION
2518 E BOEING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9a' Cisco Air Systems � WORK ORDER INSPECTION SHEET <br /> C*MPrassuf A1r SofuBons SJ-073 �'� <br /> 1nfrersWiRandDfsrrif�atnrOfthe Year 24 HR.BMEiRG-ENCY SERVICE fngersold Rand <br /> 2009.2008-20f2.2016 '�'~ fpf(OSItiZl'r¢(�NitX<.�';p$ <br /> Date of Ins action 2018 10-12 Make Ir <br /> Customer Name ❑ `RKt; . <br /> Qua t Industries Model# N6o,-CC <br /> Customer Address '2518 Boein WayS@>RVICp Plan <br /> Customer Cif /State Stoc on;CA Serial# NV290JU06243 xel �dal! <br /> Customer Contact Benn Garcla W # 22400-663389 rarOL <br /> {j , <br /> o . .• .;Wri"P�b <br /> OK Fixed 1 Chan ed 1 Cleaned 1 ebulit burin I Visit • ° ° • • ° ° <br /> C) Fixed/Changed 1 Cleaned i Rebuilt During,visit <br /> Stfl1 i i'reSiRe'afl 1 G :. n ;:+tildan n N �," - <br /> 1 Fill Out Oran Card-Re lace if NecessaW Sfw11 Re. UUes,Re airLGtiat to /; leaning. . <br /> 2 -%Run Hrs 61706 Load Hrs 41 1st Stage Dischar eTa erasure Ful i Load <br /> 3 Full Load Pk Disch 41 1/0 Press, Loaded _ Unloaded <br /> 4 9• rge Temperature 102 42 ;Oil Pressure Oil Tt:m <br /> Full Load Afrend pis arge Temperature 196 43 3z 2nd Stage Inlet Temperature <br /> 5 Full Load Coolant Injection Tem erature 163 44 <br /> 8 Tar et Press, 110 2nd Stage Discharge Temperature <br /> LoadlUnload 45 t Unloaded inlet Vacuum <br /> Auto Sto 115 Immed.Std 125 46. .' Inspect and Clean Gearcase Breather <br /> 8 ?Sump Pressure ,• <br /> 9 r,Inlet Filter Condition • ? B s<,.: .-D.:' E F. <br /> 10 PDM Filter Condition <br /> 11 . Check Coolant Level 4� Voltage @ $ C <br /> 12 To ed Full Load D ' ��+F`, <br /> Inspect for Coolant Leaks ,+�aatn«.,a. ka 48 Voltage Q �A 8+�� <br /> 13 Coolant Filter No Load C <br /> �. n,� •,.wa D p, - <br /> 14 Full Load Separator P assure Drop z si 49 of , <br /> 15 :T;1/U T2111 1 <br /> Inspect and Glean S v.Orif 1 Screen Cleaned Mt <br /> 50 o f , <br /> 16 Room Ambient Tempe ture 90 X11 9 3NV <br /> 1Thermostatic Control alve TO <br /> erature 51 rq a <br /> 18 Ports.` A B 52 L1 ? t L3> <br /> 19 - C D In for 53 an�Motor TSftJ` �T �'3 <br /> 20 InspecdClean All Air C Doled Coolers 54 • °• r KIRRP `` a,F" <br /> 21 = Inspect/Clean Conden ate Drains r £ <br /> 22 �S.r. ; Inspect Contactors <br /> inspect Hall Effect Sensors <br /> 23 = 56', ;Ck Electrical Cann. <br /> Inspect&Clean Main nd Blower Motors {�7=t "�,=Cont of Vgita e <br /> 24 ' Grease Main and Fan Motor 3 <br /> 25 WC O/C T P ° <br /> 26 = WC A1C 58 � � DC Bus Voltage(Full Load) <br /> T P 59 Package Kw <br /> 27 77 Safety Valve Installed and 0eratiorial <br /> 60 ` =Motor Speed(Max) <br /> 28 Dryer Condenser and rain Dew Point 61 Motor V.(Max Speed&Target P:) <br /> 29 ' _ ; Inspect Inlet Valve 62 ` x MotorA.(Max Speed&Target 1? <br /> 30 - Inspect Discharge C•V,and/or MPV 63. ;`Rotor Clearance <br /> 31 7 inspect Blowdown Valv <br /> 32 Coupling(Or Belts)Co ditlon Direct drive k , ° • +r <br /> 33 ;Inspect All Hoses lYli3VAt{ARTARY7 1 Sta e 2 Sta e MOT <br /> 34 .i oli hese I m1 I m2 h m1 h m2 DE <br /> v Inspect OVHS 64 Loaded dBm <br /> 35 Inspect Coalescing&P 3rticulate Filters 65 Loaded dBc <br /> r <br /> 20=1 • 1 66 Loaded dBs <br /> 36C001ant Type ulo-a coolant z ,,=:'gtERt3j$ �t _ mbr b I m1 I m2 n m1 h m2 ODE <br /> 37 Hours on Coolant 11000 67 Loaded dt3m <br /> 33 �Coolant Sample Taken Yes 68 _ Loaded B <br /> dBc <br /> 39." =Acid Test Performed Yes 69 Loaded d �-`- <br /> I arrived onsite and found the urlitvvas shut down. I cleaned up the oil mess and topped off the oil.1 put oil sorbs down. I removed <br /> the back of the motor cover off anc found no oil inside the windings so the shaft seal was not leaking. I topped off the unit and <br /> inspected for leaks. I found the cor 1pression fitting on the sump was leaking and 1 pulled it off and resealed it, I also found the oil <br /> hose on the bottom of the thermal Valve to the oil cooler was bubbling and had a small leak. I checked the orange card and found <br /> the unit hasn't had a major in 1000 D hours and the unit is alarming on change the coolant filter alarm, Need to perform a major <br /> service with oil cooler to thermal v9 Ive hose,The unit is down. <br /> UD-need to perform major service UD-need new thermal valve to oil cooler hose due to it bubbling and leaking oil. No part <br /> numbers available.JustinJ <br /> I <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.