Laserfiche WebLink
Cisco Air Systems WORK ORDER INSPECTION SHEET <br /> CampYess¢d NY Solutions 5l�ro 1973 '"�� <br /> IrglrlsallKand Distribafarafthe Year <br /> 24 HR-EMERGENCY SERVICE � Jng�etsoll�atlt� <br /> 2004.2008.2012+2016 70(,"1ri11;3t IE r. <br /> Date of Inspection 2018-10-19 Make <br /> Customer Name Que t Industries" <br /> CustomerAddress 2518 Boein UVa 1111ode!# N60H-CC <br /> Customer Ci I State Stoc on,CA Serial# NV2909U48243 x � t:ruice CaII , <br /> W.O.# CPC518318 <br /> CUStomer Contac <br /> Benny Garcia <br /> OK <br /> Fix ed 1 Chan ed J Cleaned J ebullt burin Visit ! 9 1 0" <br /> Still,>3a'UUes Q Ir11 Fixed J Changed 1 Cleaned/Rebuilt Aurin Visit <br /> R J C ti rti l, leanlnt";... ,Y4 S If'Re'uires,f2e: lr/x+ han InC)ea m ., * <br /> 1 Fill Out Oran e Card-Re face if Ne—cessa <br /> 2 Run Firs 617Q8 Load Hrs 4t) 1st Stage Discharge Tem mature Fuli Load <br /> 3 Full Load Pkg.Disch rge Temperature 41 t IJC Press. Loaded UnioE,ded <br /> 4 Full Load Airend D(sc arge Temperature 1753 ` Oil Pressure Oil Tem <br /> 5 'Full Load Coolant In ction Tem erature 158 2nd S#age Inlet Temperature <br /> 44 =' 2nd Stage Discharge Temperature <br /> 6 TarefPress. Load/Unload 45 , Unloaded Inlet Vacuum <br /> 7 Auta Sto immed.Sto 46 ;y . Insp <br /> Sump Pressure ect and Glean Gearcase Breather <br /> 8 <br /> ` �;inlet Filter Condition • • i:, <br /> 10 a PDM Filter Condition - • ' ' " s-�� +� t 1 G <br /> 11 ._;Check Coolant Level 47 <br /> 12 Full Load <br /> for CoolantLaks <br /> 48 Voltage @ A <br /> 13 Coolant Filter G <br /> 14 = Full Load Separator P essure Drop 49 0 o Load <br /> T11'; <br /> 15 AA 7`31W <br /> � Inspect and Clean Sc. v.Orif/Screen 50 of � alt! <br /> 177 <br /> 16 Room Ambient Tempe nature 51 V UroP a start= 3liN <br /> 17 777Thermostatic Control slue Tem erature t3 ` C"f <br /> 18 Ports A 52 k 1.. 2� L3;- <br /> B G q 53 an o or T11U 31211W [3 <br /> 19 :� InspectforAirLeaks 54 • o- • <br /> 20 ; InspectIClean All Air C oled Coolers c P F <br /> 21 Inspect/Clean Conden ate Drains <br /> 22 _ _ 55 g Inspect Contactors <br /> Inspect Hail Effect Sensors 56' Ck Electrical Conn. <br /> 23 ` Inspect&Clean Main nd Blower Motors 57 Control Voltage <br /> 24 Grease Main and Fan ofor �� '"` <br /> 25 WC OJC T • • <br /> •' 9 i 9 8 <br /> P 58 1 DGBus Voltage(Full Load) <br /> 26 + WG A/C T P 59 3 Package Kw <br /> 27 ? Safety Valve Installed nd Operational 60 :Motor Speed(Max) <br /> 28 ;Dryer Condensor and rain Dew Point 81 !t =}n Motor V.(Max Speed&Target f?) <br /> 29 Inspect Inlet Valve 62 ` Motor A.(Max Speed&Tar <br /> 30 Inspect Discharge C.V.and/or MPV 63 ' >Rotor Clearance <br /> 31 Inspect Blowdown Vaiv <br /> 32 Coupling(Or Belts)Co d(tion � • • o <br /> 33 , Inspect Ail Hoses NIRVf &13pfiY 1 Sta e 2 Stage) MOT <br /> 34 :+ Ins peet OWS � = -" mr1 mr2 I m1 I m2 h 1m1 h m2 DE <br /> 35 w-Inspect Coalescing&P rt(eulate Filters 64 Loaded dBm <br /> ort ® 65 Loaded dBc <br /> ® + • 66 Loaded <br /> 36 ` : Coolant Typo dBi <br /> dll'FRE . n-fir mbr b 1 m1 1 m2 OD <br /> 37 r= `Hours on Coolant 67 hm1 h m2 ELoaded dBm <br /> 38 ;a` Coolant Sample Taken as: 68 Loaded dBc <br /> 39 Acid Test Performed Yes 69 Loaded dB1 <br /> • <br /> Rip installed new cooler hoses, ra i and test, <br /> i <br /> i <br /> C <br /> i <br />