Laserfiche WebLink
Cisco Air Systems WORK ORDER INSPECTION SHEET <br /> 24 HR.EMERGENCY SERVICE <br /> la sacN tTer0F-ZOO .201., the Year I e1 ��l Ranh' <br /> zno.r.zaua.zor� � t{ <br /> Date of Ins ection 2017-)2-114-- <br /> Q <br /> Industrial/erhnolayles <br /> Customer NameMake F�i�ta"*are <br /> ues Industries Model# N60H-CC <br /> CustomerAddress 251$ oein Wa `ietc 'latt`' <br /> Customer Contact Benn Garcia Serial# NV2909U06243 x ;Rentace.Gall . <br /> W-0•# CPC2791.31 mit <br /> 4K"Fixed/Chan ed/Cieaned l R built Durin Visit .x • • • • • <br /> 5tr11 Re'hires'. e`a r,/;;h"'.."i .t; lean n ;: Fixed!Chan ed/Cieaned/Rebuilt During Visit <br /> 1 Fili Ouf Oran e Gard Ro lace if Neeessar r �� atrll' �irre R i tiara Irt t� ,aning 77 <br /> 2 40 < .1st Stage Discharge Tem erature Full Load <br /> 'Ijrf :Run Hrs 50579 Load Hrs 41 k".*I/C Press, Loaded <br /> 3 `FUII Load Pkg.Discha ge Temperature Unloaded <br /> 4 Full Load Airend Disc arge Temperature isa 43 y ail Pressure Oil Tem <br /> 5 Fuil Load Coolant In'e tipn Tem erature 1gg Y 2nd.Stage inlet Temperature <br /> 6 : T�Pres's. A4 ; 2nd Stage Discharge Temperature <br /> 7 - LoatllUnload 45 t r y Unloaded Inlet Vacuum <br /> �'AImmed.Ste 46 't., <br /> Inspect-and Clean Gearease Breather <br /> 8 =`,;Sump Pressure <br /> 9 'Inlet Filter Condition '8 , <br /> 10 a PDM Filter Condition ' ' ' r 1 f .t-.`S L 14A ,L2 G'X13. <br /> 11 =G <br /> �_ ;,� Check Coolant Level 47 Voltage C«� ;� 3 <br /> 12 inspect for Coolant Leaks Full Load perB ;� F <br /> 13 - Coolant Filter 48 <br /> No Load F <br /> 14 =j=Full Load Seperator P ssure Drop 49 0 ., T�LC1; 2 .,y <br /> 15 ; inspect and Clean Sea v.Orif/Screen 50 MotA, N: 3 �' <br /> 16 = ` Room Ambient Temperature T2N' <br /> 17 51 Drop to s A g <br /> Thermostatic Control Valve Temperature 52 LS <br /> 18 Ports Ag C D L2`: L3 i <br /> 19 53 an o or T JlJ 21 T 3AN <br /> ;Inspect for Air Leaks 54 • •. • N t?` R M <br /> 20 ",'.; Inspect/Clean Ail Air Cooled Coolers sr F" <br /> 21 ; _ Inspect/Clean Condensate Drains .. rame <br /> 22 �` Inspect Hail Effect Sensors 55 s Inspect Contactors <br /> 23 Inspect&Clean Main and Blower Motors 56 ' } #Ck Electrical Conn, <br /> ?4 Grease Main and Fan Motor 57 Control Volta a <br /> 25 _ WC AIC 58 t xu-DC Bus Voltage(Full Load) <br /> T P 59 Package Kw <br /> 27 Safety Valve Installed a d O erational 60 r Motor Speed(Max) <br /> 28 r Dryer Condensor and Crain Dew Point <br /> . Inspect Inlet Valve 61 Motor V.{Max Speed&Target P,) <br /> 29 <br /> 62a Motor A.(Max Speed&Tar et P. <br /> 30 `'` x Inspect Discharge C.V, nd/or MPV 63 ; a „a�=Rotor Clearance <br /> 31 ;, Inspect Blowdown Valve <br /> 32 Coupling(Or Belts)Condition ', rr ��; 1 Stage 2 Stage) <br /> MOT <br /> 33 Inspect Ali Hoses +}PNIR1l / &1�?TR ;a mr1 mt2 <br /> III I m2 h m1 h m2 DE <br /> 34 `' Inspect 01NS 64 Loaded dgm' <br /> 35 :7 Inspect Coalescing&Particulate Filters 65 Loaded dBo <br /> e • • - �- oaded <br /> 36 _ i Coolant Type 66 La;91f2RA&:C2i�F.RC� -d B,' h m-t h m2 ODE <br /> 37 Hours on Coolant 67 Loaded dBm mbr b Tp-t 7m2 <br /> 38 ;-: , Coolant Sample Taken Yes 68 Loaded dBe)� <br /> 39 Acid Test Performed Yes 69 Loaded dBi <br /> • <br /> Rip, found unit in alarm for a servi , reset service alarm and test, found a small leak at the shaft seal scavage tube, tighten up and <br /> cleaned, ran for 30 minutes or so a d found no leaks,returned back to service, <br />