Laserfiche WebLink
x Cisco Air Systems WORK ORDER INSPECTION SKEET <br /> C—Przss<a Air solations since 1923 24 HR. EMERGENCY SERVICE <br /> fngenaii RAnt1 Distributor of the Year, IngersollRand <br /> alT.d lnitnsfN rsol xiiog,cs <br /> 4004-2006-20(212W6 <br /> Date of Inspection 2018-1 24' Make Card <br /> Customer Name Quest ndustries` Model# N60H-CC ❑ Seivtce=plan <br /> Customer Address 2518 B eirj WaySerial# NV2909UO6243 x $gry(G$Call <br /> Customer Cit /State Stock n,GA W.O.# CPC669948 <br /> Customer Contact Benny arcia 'IIVrrn t <br /> OlC Fixed/Chan ed/Cleaned!R built During Visit oK Fixed/Chan ed/Cleaned/Rebuilt Durin Visit <br /> Stlii R airs_Re°'ii l,Cli ...in J Cfeanin .` .,.�.� .r= z - ¥, <br /> Strfi Ft ""iaires Re`aic!Chah inGiear►in` e... <br /> 1 Fill Out Oran e Card-Replace-if Necessa _ 40 1.st.Stage Discharge Tem erature Full Load <br /> 2 Run Hrs Load Hrs 41 I/C Press. Loaded Unloaded <br /> 3 Full Load Pkg.Discharge Temperature 42 Oil Pressure Oil Temp <br /> 4r' Full Load Airend Disch irgEi Temperature 43 77 7-7 2nd Stage Inlet Temperature <br /> 5 ` nit;Full Load Coolant Injection!Temerature 44 K.; 2nd Stage Discharge Temperature <br /> 6 e�' Target Press.I I Load/Unload 45 `33� Unloaded Inlet Vacuum <br /> 7 Auto Stop immed.Stop 46 , 7" Inspect and Clean Gearcase Breather <br /> 8 - Sump Pressure -• •- - • 15, <br /> B .=tz rE 1 <br /> 9 Inlet Filter Condition _ <br /> - • ' • • �E'i 2: 12,3'..Li 3 1�1fiG t:2=G L3�G <br /> 10 4 PDM Filter Condition 47 Voltage @ „A, Sr._= 7-77.71 <br /> 11 77 Check Coolant Level Full Load D '- SE ' <br /> 12 :r:Inspect for Coolant LeE ks 48 Voltage @ A g� ti .Y <br /> 13 '7 Coolant Filter No Load 777 <br /> 14 7. 7 Full Load Seperator Pressure Drop 49 0 � €i2 s tT311N <br /> 15 `� Inspect and Clean Sca .Orif/Screen 50 of <br /> 16 :' -"-"�l Room Ambient Temperture 51 Dro tart <br /> 17 :. Thermostatic Control V IveTem erature 52 <br /> 18 Ports: IA 113 JC— D 53 Fan otor <br /> 19 > Inspect for Air Leaks 54 • •• s s )a,_ RPM fiSitr. <br /> 20 %:'Inspecti'Clean All Air C oled Coolers zE ame V: A <br /> 21 z: Inspect/Clean Condensate brains 55 Inspect Contactors <br /> 22 ..: ,• Inspect Hall Effect Sensors i 56 - Ck Electrical Conn. <br /> 23 : =Inspect&Clean Main a d Blower Motors 57 rr Control Voltage M?1„ <br /> 24 Grease Main and Fan otos - • <br /> 25 == WC O/C T P 58. DC Bus Voltage(Full Load) <br /> 26 WC A/C T P 59 a Package Kw <br /> 277 Safety Valve Installed a d Operational 60 Motor Speed(Max) <br /> 28 x 7-7 Dryer Condensor and E rain Dew Point 61 Motor V.(Max Speed&Target P.) <br /> 29 7 Inspect Inlet Valve 62; Motor A.(Max Speed&Tar et P. <br /> 30 ;, Inspect Discharge C.V. and/,or MPV 63 Rotor Clearance <br /> 31 777Inspect Blowdown Valv • , <br /> 32 7 7 Coupling(Or Belts)Cor ditidn 1 Sta e 2 Stage) MOT <br /> 33 InspectAilHosesk mr1 mr2. i m1 I m2 h m1 h m2 DE <br /> 34 �.° Inspect OWS 64 Loaded dBm <br /> 35 r __L--7j Inspect Coalescing&Particulate Filters 65 Loaded dBc <br /> • • 7 • • 66 Loaded dBi <br /> 36 Coolant Type Sil*RRA#OIL'ERt?R " mbr b I m1 I m2 h m1 h m2 ODE <br /> 37 ;: Hours on Coolant 671— Loaded dBm <br /> 38 r Coolant Sample Taken Yes 68 Loaded dE3c <br /> 39 Acid Test Performed Yes 69V--- <br /> COMMENTS <br /> 9• <br /> Rip, went back to diagnosis the c de 141,checked the controller and it has a 2.65 program already, checked all the wiring, started <br /> unit and it would run at 100%, Call qd I,R support and they suggested that we replace the output module, <br /> Ud. Need a new output module. <br />