Laserfiche WebLink
Cisco Air Systems WORK ORDER INSPECTION SHEET <br /> " Can,yrr 0 Afr 5-1-00n,$1n 1973 24 HR. EMERGENCY SERVICE <br /> ir,derxvll N;Ind tlistritlutoro/tlle Year WIngerS011 Rc'n-d <br /> zav+•zaas•2012•zn,s hi@trsPrfxiTcct rrraf dies <br /> Date of Ins ection 2018-11-06 <br /> Make <br /> pK <br /> Customer Name Quest Industries` Model# N60H-CC <br /> Customer Address 2518 oeing Way $er - <br /> Serial# NV2909UO6243 x Se rge C? II <br /> Customer Cit /State Stockton, GA W.O.# W2400-669948 <br /> Customer Contact Benny par.cia00 StacE <br /> wIft Luej I ad VA M.1101 V11 <br /> arralr� <br /> QK Fixed/Changed/Cleaned/Rebuilt DuringVisit O)(Fixed/Chan ed/Cleaned/Rebuilt Dunn Visit <br /> Stili R "titres Re"aG ftG#t .'trt x/.Cleanln _ Sttll`R "vires Re atriGtSn n lCteanTrr a .w_ x <br /> 1 Fill Out Oran e Card-Re lace if Necessa 40 �; 1 st Stage Dischar a Tem erature Full Load , <br /> 2 Run Hrs snos Load Hrs 41 I/C Press. Loaded Unloaded <br /> 3 Full Load Pkg.Discha ge Temperature _ 42 Oil PressurC----� <br /> 4 Full Load Airend Disch rge Temperature i93 43 Oil"rem <br /> 5 Full Load Coolant In'e tion'Temperature 1 s2 44 ry' 2nd Stage Inlet Temperature <br /> 6 Tar et Press. lit Load/Unload 2nd Stage Discharge Temperature <br /> 45 Unloaded Inlet Vacuum <br /> 7 .: Auto Sto 120 Immed.Sto <br /> g 46 ,. Inspect and Clean Gearcase Breather <br /> t Sump Pressure .• • r .B `s✓ Q: E <br /> 9 inlet Filter Condition M1111120=1 . <br /> 10 PDM Filter Condition 47 Voltage @ A <br /> 11 7 Check Coolant LevelS 75—,07-7, <br /> 12 ?C Inspect for Coolant Le ks Full Load <br /> 48 Volta es <br /> 13 , Coolant Filter @ B C <br /> 14 <r Full Load Seperator Pressure Drop 49 oto Load p :F< <br /> 15 Inspect and Clean Sca .Orif/Screen fi2N, fi3lUU <br /> 16 50 of A. fi11U 2111 T31W <br /> Room Ambient Temper turg 99 51 Dro to <br /> 17 ";Thermostatic Control V IvelTem erature <br /> 18 Ports C <br /> A 62 PL t2 L3 <br /> B D 1 <br /> 19 Inspect for Air Leaks 53 FanotorA. 42 <br /> 20 Inspect/clean All Air C oled Coolers 54 • •• • RPM S,F. <br /> 21 Inspect/Clean Condensate brains 5 {Inspect <br /> o <br /> 22 Inspect Hall Effect Sensors �5 Inspect Contactors <br /> 23 Inspect&Clean Main aid Blower Motors 67 Ck Electrical Conn. <br /> 24 57~ g Control Volta e3r*x <br /> Grease Main and Fan otoI NMI ir <br /> 25 <br />