Laserfiche WebLink
1 Cisco Air Systems WORK ORDER INSPECTION SHEET <br /> Lvmp xrrr I AISW 11104$JMCr 1973 24 HR.EMERGENCY SERVICE <br /> hu'rsollRand Distributor ofthe Year TOLL FREE 800-813-6763 Ingersoli�c7nd <br /> 1004-2008.2012.2018 hxtu5oi.rt kchn'Vo.9105 <br /> CL#479665 <br /> Date of Inspection 2019-04-15 Unit I.D. Ir _ <br /> Customer Name Quest ndustries* Model No. R55n 'r{ <br /> Location 2518 Boeing Way Serial No. NK3556U18 $ <br /> Customer Contact Benny(parole W.O.# PC709461 s ° <br /> QK Re laced/Cleaned/Rebuilt urlin Visrt r 0{ Re laced J Cleaned/RebuiltDirinn Viglt • <br /> Stiff rRe tl3res5l3e`'air l r?Inert Clealytn4 3 ;Stilt Re rilres:Re airIFUhah ih t Cleanin ,r <br /> 1 1 FIII Out Oran e Card eplace i necc3ssa 39 > <br /> 2 X Run rs. 2o6s -- st tags Disch.Tem uii Load <br /> 3 -X, Load Hrs. 40 - I/C Press. Loaded Unloaded <br /> Hours on Coolant 2059 41 I/ <br /> 4 Pressure <br /> �X Tar et or Load/Unload Pressure 110OD Term <br /> 5 ?X xe Auto Sto 120 Immed.Sto 125 42 `�`2nd Stage Inlet Temp. <br /> 6 'X Fuli Loa Airend Disch rge Temp. 991° 43 2nd Stage Disch.Temp. <br /> 44 Unloaded Inlet Vacuum <br /> 7 'X = 'Full Load Coolant Inje tion Temp, <br /> 8 X >k.Full Load Pkg.Dischar e Ternp. —100 4 r in: ect/Clean Gearcase Breather <br /> 9 :'X a%, Room Ambient Temp. 88° - , A $ CD E 6 <br /> 10 Thermostatic Control Ive Tem ° L L = •Lf t 1 G iL2"G, <br /> IIE2 Watercooled O/C IN 46 Voltage @A x 463 )d _qg4 C.: 465 <br /> x Full Load D 269 <br /> 12 <'t Watercooled A/C OU7 E 27,0 F 271 <br /> 13 Unloaded Sump PSI IN OUT 47 Mot A. R L. T1/tl 115 .T2t Z' 118 1,., _, 116 <br /> 14 — a Full Load Separator Pressure Drop 3 49 P F L 1. a7 91 <br /> 15 _X Coolant.Filter D/P 5 F A. T I/U 1,2 1.2 13NU 1.5 <br /> 16 X CoolantT e 50 Oil Pum A. Tial � . <br /> YP Ultra coolant { 74 ( 2990 3 F 1,2b <br /> 17 X : Coolant Sample Taken Yes: © No Q 52rame m,< <br /> 18 Acid Test Performed Yes ❑ No V 400 M A% 140 <br /> 19 X Check Coolant Level bs O #t#th t ,F2 1=; I.,W 4.5s <br /> 20 X Inspect for Coolant Leas >4 X Inspect Contactors <br /> 21 !X Inspect for Air Leaks 55 =Ck Electrical Conn. <br /> 22 %X Safety Valve Installed/, 56 Control Volta e _ 7— , 24 <br /> • <br /> 2377 Inspect Discharge C.U. /MPV 57=X Package Kw 6e <br /> 24 X Inspect Slowdown Valy 58 X = Motor Speed(Max) 2515 <br /> 25 f Coupling/Belts Condition <br /> 26 XInspect All Hoses 59 :rX Motor V.(Max Speed&Target P.) $30 <br /> 27 :X Inspect OWS 60 X Motor A.(Max Speed&Target P.) 123 <br /> 28 '' Inspect Coalescing/Paiticulate Filters fi1 'X ; DC Bus Voltage(Full Load) 617 <br /> 29 ;X Inspect/Clean All Air Cooled Coolers 62 r X ° Rotor Clearance •020 <br /> 30 ''X Inspect/Clean Conden ate Drains 63 Ins ect Ha11Effect Sensors <br /> 31 ,X Inspect/Clean Main/Bl ower Motors 1 Sta e • r e <br /> 32 Grease Main/Fan Moto 2 Sta e MOT <br /> 33 X 4 Inspect and Clean Scav:Orif/Screen mr1 mr2 b I m1 I m2 h m1 h m2 DE ODE <br /> 34: X _ Inlet Filter Condition 23 15 1 <br /> 35 = X PDM Filter Condition 17 a -2 <br /> 38 Dryer Drain Clean 22 � 22 <br /> 3777 Dryer Condenser Clean Reset Service Timer yes X no p0# <br /> 38r— .r Dew Point Returned Part es no X Tech Name 0L-Tr <br /> • <br /> Arrived on site checked in with cu tomer performed a minor service with oil filter and oil sample. No issues unit is back up and <br /> running. Ows needs service customers requests no write up and does not want a service. <br /> CL-TT <br /> i <br /> E . <br />