My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:35:52 PM
Creation date
7/22/2020 3:34:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� -3: <br /> San Joaquin County EHD <br /> September 5, 2008 <br /> Page 2 of 10 <br /> building. The USTs were removed in 1989 and were not replaced. Fuel is no longer dispensed at <br /> the Site. Soil samples collected from beneath Tank #1, Tank #2, and the product line indicated a <br /> petroleum hydrocarbon release. A detailed site description and work history are provided in <br /> Ground Zero's Site Conceptual Model dated February 29, 2008 and Ground Zero's Feasibility <br /> Study—Soil and Groundwater Remediation Report dated July 2, 2008. <br /> The purpose of the pilot test is to determine the size and specifications of an off-gas treatment <br /> system necessary to address contaminant concentrations at the Site as well as to determine the <br /> radius of influence (ROI)of a SVE/IAS system. The ROI will be used to determine the number and <br /> locations of extraction wells needed to effectively cover the contaminated area. <br /> PROPOSED SCOPE OF WORK <br /> Ground Zero proposes the installation of vapor extraction, observation, and air sparging wells <br /> necessary to conduct an in-situ groundwater and off-gas treatment pilot test. The pilot test will <br /> consist of soil vapor extraction from the vadose zone and the injection of air into groundwater to <br /> enhance the volatilization and recovery of volatile organic compounds. If the results of the pilot <br /> test indicate SVE/IAS is a viable remediation alternative for this Site, the results will be used to <br /> design a full scale remediation system. <br /> Permitting <br /> Upon approval of this workplan, well installation permits will be obtained from EHD. The EHD <br /> will be given advanced notice of all work to be performed at the Site. The area in which drilling <br /> activities will be conducted will be cleared of underground utilities by Underground Services Alert <br /> prior to any work being performed at the Site. The San Joaquin Valley Air Pollution Control <br /> District will not require a permit for the pilot test. <br /> Well Installation <br /> Ground Zero proposes the installation of two vapor extraction wells (VEWs), one air sparging <br /> well (ASW), and three observation wells (OWs) near the locations shown in Figure 3. Soil <br /> samples will be collected in three boring locations to characterize residual soil contamination <br /> near the pilot test location. <br /> GAGROUMMMARRYS AUTO\Reports\Workplans\wp sve pilot test.doc <br /> i <br />- - - sti <br />
The URL can be used to link to this page
Your browser does not support the video tag.