Laserfiche WebLink
SWRCB , January 2002 Page of j <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ElProfessional Engineer <br /> ❑ Other (Spec) f <br /> Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) j <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1 / 10 x 15 Psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3" 3 " <br /> Length of Piping Run: Approx. 130 ' Approx. 100' Approx, 120 ' Approx. 125 ' <br /> Product Stored: Regular 87 Race 100 Super 91 Diesel <br /> Method and Iocation of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> i ing-run isolation : Piping Sump # 1 Piping Sump #2 Piping Sump #3 Piping Sump #4 <br /> i <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes ? <br /> pressure and startaig test: <br /> Test Start Time : 8 : 55 8 :45 9 :25 8 : 35 <br /> Initial Reading (RI) : 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 9 : 55 9 :45 10 :25 9 :35 <br /> Final Reading (RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour I Hour <br /> Change in Reading (RF-Ri). 0 0 0 0 <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments — (inch(de information on repairs made prior to testing, and recommended follow"up for failed tests) <br /> Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump, prior to Testing. ' <br /> s <br /> i <br /> r <br />