Laserfiche WebLink
SWRCB, January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING ! <br /> I <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry Standard X Professional Engineer j <br /> 0 Other (Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other (Spec) i <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: . 002 <br /> UDC # 1&2 UDC # 3&4 UDC # 5&6 UDC # 7&8 <br /> UDC Manufacturer: Total Containment Total Containment Total Containment Total Containment <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 32" 39" 32" 29" <br /> Height from UDC Bottom to Top 20" Vapor 20" Vapor 15 Vapor 16" Vapor <br /> of Highest Piping Penetration: 12" Product 14" Product 16" Product 10" Product <br /> Height fiom UDC Bottom to 6" 5 " 6" 5" <br /> Lowest Electrical Penetration: i <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Line 24" Water Line 24" Water Line 19" Water Lure 20" <br /> Does turbine shut down when <br /> UDC sensor detects liquid (both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- yes Yes Yes Yes <br /> safe shutdown?' <br /> Was fail-safe verified to be No No No No <br /> operational?" <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes i <br /> water and starting test <br /> Test Start Time: 10 :27 10 :22 9 : 57 9 :47 <br /> Initial Reading (RI) : .001 .001 . 001 .001 <br /> Test End Time: 10 :57 10 : 52 10:27 10 : 17 <br /> Final Reading Rr): .001 .001 . 001 .001 <br /> Test Duration : 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading (RFmRr): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 005/30 Minutes . 005/30 Minutes . 005/30Minutes .005/30 Minutes <br /> Test Result; Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes } <br /> Was sensor properly replaced and <br /> verified functional after testing? yes Yes Yes Yes ; <br /> Comments — (include information on repairs made prior to testing, acrd recommended follow-tip for falled tests) <br /> i <br /> i <br /> j <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk ( *) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG460) <br />