Laserfiche WebLink
F. In-Tank Gauging ! SIR Equipment: ® Check this box if tank gauging Is used only for inventory control. <br /> ❑ Check this box If no tank gauging or SIR equipment Is Installed. <br /> This section must he completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ® Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No• Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> i <br /> ' in Section H, below, describe how and when these deficiencies were or will be corrected. <br /> i <br /> Line Leak Detectors (LLD): ❑ Check this box If LLDs are not installed. <br /> Complete the followln checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rale: ® 3 g.p.h.; ❑ 0.1 g , p.h ; ❑ 0.2 g.p,h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLDs, does the LLD restrict product Now if It detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ! <br /> i <br /> ® NiA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions or falls a test? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually Inspected? i <br /> IF4 N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> i <br /> i <br /> H. Comments: <br /> 2!21 /07 <br /> Monitoring System Certification Page 3 of <br /> i <br /> i <br />