Laserfiche WebLink
I <br /> F <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: TOKAY SHELL 420 KETTLEMAN LANE LODI CA 96240 <br /> KEY DIE . . . . 87. <br /> A=ANNULAR <br /> F FILL . 6 . 8 ` I <br /> Y=VAPOR \ A <br /> P=PROBE . . . . . . . . . . . . . . T i <br /> T=TURBINE . . . . . . 5. . . . . . . . . . 7. p V t <br /> X=SENSOR , , <br /> 0=0VERFILLSENSOR <br /> . . , 2. 4. ; <br /> x O <br /> 1 <br /> 10 9. . <br /> RI . . . V 0 . <br /> 1006 6 a .91 . <br /> .WASTEOIL, R .VENTS <br /> A CAS <br /> . . . . . . . . . . . . . . . . . . 4 <br /> ATG . . . . . <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may Include It, rather than this page, with your Monitoring System Certification, On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (If used for leak detection). In the space provided, note the dale this Site Plan was prepared, <br /> Monitoring System Certification Page 4 of 4 2/21 /07 <br />