Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) i <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/ 10 x 15 Psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith I <br /> Piping Diameter: 3 " 3 " 3" 3 " <br /> Length of Piping Run: Approx. 130 ' Approx, 100 ' Approx. 120 ' Approx, 125 ' <br /> Product Stored: Regular 87 Race 100 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation : Piping Sump # 1 Piping Sump #2 Piping Sump #3 Piping Sump #4 <br /> i <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test. <br /> Test Start Time : 8 : 55 8 :45 9125 8 : 35 <br /> Initial Reading (RI) : 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 9 : 55 9 :45 10 :25 9:35 <br /> Final Reading (RF) : 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Houle 1 Hour 1 Hour <br /> Change in Reading (RF-Rr) : 0 0 0 0 <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable lass No detectable loss <br /> Criteria: <br /> Test Result : Pass Pass Pass Pass <br /> Comments — (Include information on repairs made prior to testing, and r•ecornmended follow-up for failed tests) <br /> Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump, prior to Testing. 1' <br /> i <br /> C � <br /> i <br /> i <br />