My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 3:18:10 PM
Creation date
7/22/2020 4:14:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB, January 2002 Page of <br /> 8. UNDER-DISPENSER CONTAIlYIVMNT C TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution , . 002 <br /> UDC # 9 &10 UDC # UDC # UDC # ] <br /> UDC Manufacturer: Total Containment <br /> UDC Material: Poly Plastic I <br /> UDC Depth: 32" <br /> Height from UDC Bottom to Top 12" Product j <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 15" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry <br /> testing: <br /> Portion of UDC Tested' Water Line 19" <br /> Does turbine shut down when <br /> UDC sensor detects Iiquid (both Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail- yes <br /> safe shutdown?' <br /> Was fail-safe verified to be No <br /> operational?" ' <br /> Wait time between applying 5 Minutes <br /> water and starting test <br /> Test Start Time: 8 : 52 <br /> Initial Reading (Ri): .001 <br /> Test End Time: 9 :22 <br /> Final Reading (RF): .001 <br /> i <br /> Test Duration: 30 Minutes ` <br /> Change in Reading (R.F-Rj) : 0 <br /> Pass/Fall Threshold or Criteria: .005/30 Minutes <br /> Test Result: Pass <br /> Was sensor removed for testing? 'Yes <br /> Was sensor properly replaced and yes <br /> verified functional after testing? <br /> Comments — (include information on repahs made prim to testing and recominended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to an of the questions indicated with an j <br /> asterisk { *) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG 160) <br /> i <br /> i. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.