My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N NA <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ❑ 3 GPH11El <br />0.1 GPH ❑ 0.2 GPH <br />El <br />Was the testing apparatus properly calibrated? <br />❑ <br />El ElFor <br />emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ El <br />mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑ <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />1 ❑ 1 ❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ ❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ ❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />❑ <br />❑ ❑ <br />For any answer of 'W" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />NO FUEL TO TEST THE PLLD'S AT THIS TIME. <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br />Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed ff VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality <br />Test <br />Interstitial Communication <br />Test <br />S-1 87 PRODUCT ❑ Pass ❑X Fail <br />❑ Pass <br />❑ Fail <br />S-2 87 VENT ❑X Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S-3 87 VAPOR ❑X Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S-4 91 PRODUCT ❑X Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S-5 91 VENT ❑X Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S-6 DIESEL PRODUCT ❑X Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />S-7 DIESEL VENT ❑X Pass ❑ Fall <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br />X Other Describe the method in section XV below. Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />ONLY TESTED THE LIQUID SENSOR FOR THE VACUUM SENSORS AT THIS TIME. <br />GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuumlPressure/Hydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.