My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br />Type of Action Q Installation Inspection ❑ Repair Inspection ❑ 36 Month Inspection <br />I. FACILITY INFORMATION <br />CERS ID <br />Date of Overfill Prevention Equipment Inspection <br />10/29/2018 <br />Business Name (Same as Facility Name or DBA -Doing Business As) <br />ARCO <br />Business Site Address <br />6009 N. EI Dorado Street <br />City <br />Stockton <br />ZIP Code <br />195207 <br />II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification) <br />CHRIS BISHOP <br />Phone # <br />Contractor I Tank Tester License # <br />949066 <br />ICC Certification # <br />8216429 <br />ICC Certification Expiration Date <br />5/2/2020 <br />Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br />VEEDER ROOT#B36744 EXP 06/19/2020, OPW#0174929 EXP 07/11/2020 <br />III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br />Inspection Method <br />Used: <br />Q Manufacturer Guidelines (Specify): OPw DROP TUBE INSTALLER GUIDE AND VEEDER ROOT MAG PLUS OVER FILL TESTING PROCEDURE. <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br />Attach the inspection procedures and all documentation required to determine the results. <br /># of Attached Pages <br />TANK ID: (By tank number, stored product, etc.) <br />87 SOUTH <br />87 NORTH <br />91 <br />DIESEL <br />What is the tank inside diameter? (Inches) <br />120.00" <br />120.00" <br />120.00„ <br />120.00„ <br />Is the fill piping secondarily contained? <br />Z Yes ❑ No <br />0 Yes ❑ No <br />Z Yes ❑ No <br />El Yes ❑ No <br />Is the vent piping secondarily contained? <br />0 Yes ❑ No <br />Yes ❑ No <br />I] Yes E NoYes <br />x <br />❑ ❑ No <br />Overfill Prevention Equipment Manufacturer(s) <br />OPw 71SO <br />OPw 71 SO <br />OPw 71 so <br />OPw 71 so <br />A.V. MAG PLUS PROB <br />A.V. MAG PLUS PROB <br />A.V. MAG PLUS PROB <br />A.V. MAG PLUS PROS <br />What is the overfill prevention equipment response <br />when activated? <br />(Check all that apply.) <br />E Shuts Off Flow <br />x Restricts Flow <br />❑ <br />E AN Alarm <br />❑ Shuts Off Flow <br />Ex Restricts Flow <br />Ex AN Alarm <br />❑ Shuts Off Flow <br />❑x Restricts Flow <br />❑x AN Alarm <br />❑ Shuts Off Flow <br />❑x Restricts Flow <br />AN Alarm <br />Are flow restrictors installed on vent piping? <br />❑ Yes I] No <br />E Yes ❑x No <br />❑ Yes 0 No <br />❑ Yes ❑>< No <br />At what level in the tank is the overfill prevention set <br />to activate? (Inches from bottom of tank.) <br />99.75" <br />99.50" <br />98.12" <br />99.375" <br />What is the percent capacity of the tank at which the <br />overfill prevention equipment activates? <br />95% <br />95% <br />95% <br />95% <br />Is the overfill prevention in proper operating condition <br />to respond when the substance reaches the <br />appropriate level? <br />9 Yes <br />❑ No (Specify in V) <br />Yes <br />❑ No (Specify in V.) <br />Yes <br />❑ No (Specify in V.) <br />p Yes <br />❑ No (Specify in V.) <br />IV. SUMMARY OF INSPECTION <br />RESULTS <br />Overfill Prevention Inspection Results z Pass ❑ Fail I 0 Pass ❑ Fail ❑ x Pass E3 Fail r Q Pass E] Fall <br />V. COMMENTS <br />Any items marked "Fail" must be explained in this section. Any additional comments may als vidf har; <br />Nt,,l 0 9 2018 <br />VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br />14 <br />I hereby certify that the overfill prevention equipment was inspected in accordance with Oal fbinla Code of R6§61MW6o , ra 23. <br />Division 3, Chapter 16, Section 2637.2 end all the information contained herein is accurate. <br />UST Service Technician Signature J�f <br />If the facility has more component3'than'this F ' accommodates, additional copies of this page may be attached. <br />CERS = Cafdomia Environmental Reporting System, ID = on, UST = Undergmund Storage Tank, ICC = Intematiorlal Code Council, AtV = A dble and Visual <br />
The URL can be used to link to this page
Your browser does not support the video tag.