Laserfiche WebLink
I <br /> ITEM #16 & 17 <br /> IN <br /> a. When the primary tank is empty. 3. Tank sump components shall be constructed of fiberglass <br /> b. When the primary tank is partially or completely full and reinforced plastic.The tank sump shall be 42"or 48"in <br /> the ground water table is below tank bottom. diameter and must mount to the secondary containment <br /> collar.Standard tank sump shall consist of an octagon <br /> c. and theankn the is ary tankis partiallyelor completelyfull shaped base(round base is optional),round body extension <br /> and the tank is partially or completely submerged in <br /> groundwater. and enclosure top. <br /> ' and <br /> 6. The leak detection performance of the monitoring system 4. The octagon base shall bents.Th base mustb capable <br /> shall be tested and verified by a qualified independent panels for piping entryh a nts.The base must be capable of <br /> joining to the collar with an internal adhesive channel. <br /> consultant to detect leaks in the primary or secondary tank <br /> walls as small as 0.10 gallons per hour within one-month. 5. A 34"O.D.watertight lid shall be provided at the submersible <br /> 7. The hydrostatic monitoring system shall be capable of a and fill/vapor end of the tank and provide a watertight seal <br /> precision tank test that is listed by the National Work Group to the sump enclosure withl2"of water above the lid and <br /> on Leak Detection Evaluations(NWGLDE)and be listed as a remain leak free. <br /> continuous interstitial monitoring method(liquid filled)by 6. Referto tank sump drawings for standard models and <br /> ' NWGLDE. configurations. <br /> 8. If hydrostatically monitored,any solution used in the G. Ladders <br /> monitoring space shall be compatible with the tank and be 1. Ladders shall be supplied by the tank manufacturer(carbon <br /> of a contrasting color to the tank. steel,stainless steel,aluminum). <br /> 2.02 Accessories H. Anchor Straps <br /> A. Flanged Manways 1. Straps shall be supplied bythe tank manufacturer. <br /> 1. The standard manway is 22"I.D.and will be furnished with 2. Number and location of straps shall be as specified by <br /> ' UL listed gaskets and covers(30"and 36"manways are manufacturer. <br /> optional). 3. Each strap shall be capable of withstanding a maximum load <br /> 2. Location-see standard tank drawings. of 25,000 lbs. <br /> 3. Optional manway extensions shall be fiberglass I. Prefabricated Concrete Deadmen Anchors <br /> and_feet long. 1. Design Conditions-Deadmen shall meet the following <br /> B. Fill Tubes-Fill tubes of appropriate design shall be supplied by design criteria: <br /> contractor. a. Deadman shall be designed to ACI 318 <br /> C. Hydrostatic Monitor Accessories b. Manufactured with 4,000 psig concrete <br /> 1. Brine monitoring Fluid shall be a calcium chloride solution, c. Manufactured in various lengths <br /> 2. Double Float reservoir sensor supplied by contractor shall be d. Provide adjustable anchor points for hold down straps <br /> designed for CSl reservoirs.The components of the sensor J. Liquid Sensor Drawstring <br /> shall be compatible with brine and provide two alarm points <br /> ' positioned 10"apart. 1. Galvanized steel drawstring shall be factory installed at the <br /> D. Secondary Containment Collar <br /> monitoring fitting to facilitate field insertion of sensor.1. UL label shall be affixed to collar. K. Fittings Threaded NPT <br /> 2. The collar shall be fiberglass reinforced plastic,42"or48"in 1. All threaded fittings shall be located on a manway cover or <br /> ' within 12"of the tank top center line.Fittings to be supplied <br /> diameter and shall be factory-installed in accordance with with temporary thread protectors or threaded plugs. <br /> drawings. <br /> 3. The collar shall include an internal adhesive channel. <br /> 2. All standard fittings shall be 4"diameter NPT half couplings. <br /> 3. Internal piping shall be terminated at least 4"from the tank <br /> 4. The collar shall be included in the 30-year tank warranty. bottom(6'for 12'diameter tanks). <br /> E. Adhesive Kit(Kit AD) Part Ill:Execution <br /> 1. UL Listed and alcohol compatible adhesive kit shall provide 3.01 Installation and Testing <br /> a watertight seal at the tank sump and containment collar <br /> ' joint to prevent the ingress of water or egress of fuel.The Fiberglass underground tanks must be tested and installed according <br /> adhesive kit includes resin,catalyst,mixing stick,putty knife, to the current installation instructions provided with the tank(refer to <br /> sandpaper,grout bag,and installation instructions. Containment Solutions Pub.No.INST 6001).Tanks are installed with pea <br /> F. Tank Sumps gravel or crushed stone as specified in current installation instructions. <br /> ' 1. UL label shall be affixed to tank sump components. Containment Solutions'tanks are intended for storing products listed <br /> 2. Tank sumps&collars shall be listed by Underwriters in the warranty;any other products not listed in the warranty must be <br /> Laboratories for petroleum fuels and all blends of alcohol approved in advance by Containment Solutions. <br /> (same as tank).Collar and sump shall be tested and listed as PartiV.,Limited Warranty <br /> ' a complete sump system. 4.01 Limited Warranty <br /> Warranty shall be Containment Solutions limited warranty in effect <br /> at time of delivery. <br /> ' SPECIFICATIONS 18 <br />