My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # 207 <br /> Mag Probe Installation UST/AST Tank-Dedicated Riser <br /> Flexible conduit ' <br /> Use bushing and body of grip supplied with AST kit <br /> fitting supplied with probe and Liquidtight <br /> Adaptor nut supplied with AST kit. fittings from <br /> ASt Weatherproof function box with <br /> Riser pipe:2-,3-,or 4"API 1/2"NPT threads 16 cubic inch <br /> schedule 40-depending on _ minimum) <br /> probe type f Epoxy seal per NFPA specs ' <br /> A Rigid conduit <br /> A = 10" minimum for global mag 1 <br /> plus/mag plus probes. When <br /> installing a probe longer than the <br /> the tank diameter, increase this Split-Ring Collar <br /> minimum dimension to Compensate. (P/N 576008-617) <br /> (Example: a 7-6"diameter tank will — - - required if probe <br /> use an 8'probe, in which case you enters the riser. ' <br /> must add 6"to minimum riser length <br /> Tpp.ew -�-� <br /> sae mew <br /> Mag Probe , <br /> l l (rests on bottom) <br /> Figure 11. AST Probe Installation-Dedicated Riser ' <br /> 2. If you are installing the metal cap and adapter ring (see Figure 4 on page S), screw the ring onto the 4" riser <br /> until the gasket contacts the pipe, then use a pipe wrench to tighten it an additional 3/4 turn. Push the cable t <br /> through the metal cap and cord grip,then clamp the cap onto the ring. <br /> At sites that require installation of a riser adaptor (Phil-Tite M/F 4X4 or equivalent) at the top of the riser, do so <br /> following the manufacturer's instructions. Next screw the adapter ring from the Veeder-Root kit (P/N 312020- ' <br /> 952) onto the riser adaptor by hand until the gasket contacts the sealing surface.Then use a torque wrench at- <br /> tached to an appropriate strap wrench (K-D Specialty tools nylon strap oil filter wrench, or equivalent) and tight- <br /> en the ring to 35 -45 ft-lbs. Loosen the cord grip nut and push the cable through the metal cap and cord grip, <br /> then clamp the cap onto the ring (see Figure 12). , <br /> 744-14.eps Q P O <br /> o : d JTank a PMetal cap from kitAdapter ring from kitRiser adaptor(Phil-Tite M/F4X4,or equivalent) <br /> Figure 12. Installing a riser adaptor beneath the metal cap and adapter ring ' <br /> 14 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.