My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Item # 207 <br /> Mag Probe Installation Mag Probe Field Wiring Connections <br /> ' 3. Make sure there is a minimal amount of slack between the probe and cap,then tighten the cord grip nut until <br /> the cable is held firmly. Push the end of the cable through the field J-box cord grip,then tighten that cord grip <br /> nut as well.Splice and seal the wires in the J-box. <br /> ' AST RISER CAP ATTACHMENT <br /> 1. If you are using the one piece cap (see Figure 3), push the end of the probe cable through the cap and cord <br /> grip bushing, leaving a minimal amount of slack between the probe and cap. Discard the cord grip nut and <br /> ' attach the Adaptor Nut from the AST kit to the cap (see Figure 6).Tighten the Adaptor Nut until the cable is <br /> held firmly. Go to Step 3. <br /> 2. If you are installing the metal cap and ring (see Figure 4), screw the ring onto the 4" riser until the gasket <br /> ' contacts the pipe,then use a pipe wrench to tighten it an additional 3/4 turn. Using UL-classified pipe sealant <br /> (suitable for the fuels involved), screw the cord grip fitting into the tapped hole and tighten. Place the cord grip <br /> bushing in the fitting. Discard the cord grip nut and loosely screw the Adaptor Nut from the AST kit onto the <br /> ' cord grip fitting (see Figure 6). Push the cable through the metal cap, bushing, and Adaptor nut,then clamp <br /> the cap onto the ring. Make sure there is a minimal amount of slack between the probe and cap, then tighten <br /> the Adaptor Nut until the cable is held firmly. <br /> 3. Next assemble the liquid tight connectors on both ends of the flexible conduit as shown in Figure 6. Push the <br /> ' cable through the flexible conduit assembly and into the J-box. Connect the flexible conduit assembly to the <br /> Adaptor Nut on one end and the J-box on the other. <br /> 4. Tighten the fittings until snug. Splice and seal the wires in the J-box. <br /> Mag Probe Field Wiring Connections <br /> Figure 13 shows the field wiring diagram of the probe to console cable. Observe polarity. <br /> ' Do not ground drain wire <br /> in junction box <br /> To <br /> TLS Seal-off 1 From <br /> ' Console Probe <br /> + White <br /> 1/2"rigid ' <br /> conduit <br /> Epoxy sealed connections in a <br /> weatherproof junction box <br /> ' Figure 13. Field Wiring Probe to Console Cable <br /> SEALING FIELD CONNECTION <br /> Wiring Run Through Rigid Conduit <br /> 1. Route the wire from the probe canister into the weatherproof junction box. If necessary, pull the two-wire cable <br /> ' from the console into the junction box. <br /> 2. Using wire nuts, connect the two wires from the probe to the two wires from the console.To observe polarity, <br /> record wire colors or tag wires when making these connections at the console. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.