Laserfiche WebLink
RECEIVED <br /> Aaron Hang JAN 1 9 2018 <br /> Environmental Health Specialist <br /> San Joaquin County <br /> Environmental Health Department(EHD) -3- ENVIRONMENTAL HEA1011ary 18, 2018 <br /> DEPARTMENT <br /> c. For#14, it states tank anchoring is optional. Tank anchoring is not optional. <br /> Response: The plan has been revised, the tank anchoring is not optional. <br /> 10. M.5.3.16, fill sump detail on section A, and D look different from one another. <br /> Response: Fill sumps on the 91 and diesel tank are single fill. The 87 tank is dual fill. <br /> We believe that the responses above, together with the enclosed revised plans and technical documents, <br /> address all of the comments in your letter dated December 21, 2017. Please review and approve the <br /> enclosed documents at your earliest convenience. Should you have questions or need additional <br /> information, feel free to contact Ryan Bharucha at rbharucha@barghausen.com, or me at <br /> ainigues@barghausen.com, or either of us at(425) 251-6222. Thank you. <br /> Respectfully, <br /> M. Alexia Inigues <br /> Project Planner <br /> MAI/RB/hd <br /> 17866c.018.doc <br /> enc: As Noted <br /> cc: Gurpartap (Gary) Singh, Grin Investments, Inc. <br /> Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br /> Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br /> Omar Vasquez, Barghausen Consulting Engineers, Inc. <br /> Sherise Parker, Barghausen Consulting Engineers, Inc. <br /> Joshua A. Harlan, Barghausen Consulting Engineers, Inc. <br /> Ryan Bharucha, Barghausen Consulting Engineers, Inc. <br />