Laserfiche WebLink
Aaron Hang [EH] <br /> From: Ryan Bharucha <rbharucha@barghausen.com> <br /> Sent: Thursday,January 25, 2018 12:41 PM <br /> To: Aaron Hang [EH] <br /> Cc: Josh Harlan;Alexia Inigues;Jay Grubb;Chris Ferko <br /> Subject: CA-Stockton ARCO/Revised Sheets that Reflect Double Wall Piping/BCE#17866 <br /> Attachments: 17866-Sheet M5302 Materials List.pdf; 17866-G.0.5.pdf; 17866-G.0.2.1.pdf <br /> Categories: Red Category <br /> Aaron, <br /> Pursuant to the conversation we had yesterday I have attached the revised pages that now reflect the double walled <br /> lining for the piping on the two pages we spoke about. I have also attached a copy of the equipment listing so that you <br /> may see the referenced equipment numbers. <br /> 1. Sheet G.0.21#9-10 Indicated Single walled piping.This needs to change to reflect Double Wall <br /> a. Sheet G.0.21. Numbers nine (9) and ten (10) have been revised to reflect Double Walled for the Vent <br /> Piping and Stage II Vapor Recovery Piping. <br /> 2. Sheet G.0.5 Section for Dispenser Sump Crossover Piping for FRP.This also shows Single Wall and needs to revise <br /> to show Double Wall Piping. <br /> a. Sheet G.0.5. Has been revised to reflect Double Walled Piping. <br /> 3. Also, In the Buoyancy Calculations there is no signature from a PE. <br /> a. We will include signatures from the PE in the Final Submittal. <br /> I also recall discussing that these were just small errors that you noticed with your initial review, and that if your <br /> supervisor had any other comments another letter would be issued. However, I figured it would be better to give you <br /> these sheet in advance just to help speed up the process. <br /> If you have any other questions please feel free to contact us. <br /> Thank you for the Help, <br /> Ryan Bharucha I Project Coordinator <br /> Office: 425-251-6222 1 Ext: 7369 <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72nd Avenue South, Kent WA 98032 <br /> www.barghausen.com <br /> t <br />