My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aaron Hang [EH] <br /> From: Ryan Bharucha <rbharucha@barghausen.com> <br /> Sent: Thursday,January 25, 2018 12:41 PM <br /> To: Aaron Hang [EH] <br /> Cc: Josh Harlan;Alexia Inigues;Jay Grubb;Chris Ferko <br /> Subject: CA-Stockton ARCO/Revised Sheets that Reflect Double Wall Piping/BCE#17866 <br /> Attachments: 17866-Sheet M5302 Materials List.pdf; 17866-G.0.5.pdf; 17866-G.0.2.1.pdf <br /> Categories: Red Category <br /> Aaron, <br /> Pursuant to the conversation we had yesterday I have attached the revised pages that now reflect the double walled <br /> lining for the piping on the two pages we spoke about. I have also attached a copy of the equipment listing so that you <br /> may see the referenced equipment numbers. <br /> 1. Sheet G.0.21#9-10 Indicated Single walled piping.This needs to change to reflect Double Wall <br /> a. Sheet G.0.21. Numbers nine (9) and ten (10) have been revised to reflect Double Walled for the Vent <br /> Piping and Stage II Vapor Recovery Piping. <br /> 2. Sheet G.0.5 Section for Dispenser Sump Crossover Piping for FRP.This also shows Single Wall and needs to revise <br /> to show Double Wall Piping. <br /> a. Sheet G.0.5. Has been revised to reflect Double Walled Piping. <br /> 3. Also, In the Buoyancy Calculations there is no signature from a PE. <br /> a. We will include signatures from the PE in the Final Submittal. <br /> I also recall discussing that these were just small errors that you noticed with your initial review, and that if your <br /> supervisor had any other comments another letter would be issued. However, I figured it would be better to give you <br /> these sheet in advance just to help speed up the process. <br /> If you have any other questions please feel free to contact us. <br /> Thank you for the Help, <br /> Ryan Bharucha I Project Coordinator <br /> Office: 425-251-6222 1 Ext: 7369 <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72nd Avenue South, Kent WA 98032 <br /> www.barghausen.com <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.