My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�LL��y SAN:JOAQUIN Environmental Health Department <br /> "i�A —COU NTY— Linda Turkatte, REHS, Director <br /> oyr Greatness grows here. Kasey Foley,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellan, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Rodney Estrada, REHS <br /> Willy Ng,REHS <br /> January 26, 2018 Muniappa Naidu,REHS <br /> Josh Harlan <br /> Barghausen Consulting Engineers, Inc. <br /> 18214 72nd Ave. <br /> Kent, WA 98032 <br /> Re: ARCO ampm SR0078036 <br /> 6009 N EI Dorado St. <br /> Stockton, CA 95207 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application foga permit to install an underground storage tank (UST) system at the above noted <br /> address. Please provide the following additional information (three copies each) and address the <br /> following comments: <br /> 1. G.0.2.1, Section (9) Vent Piping Installation, indicates installation of single wall fiberglass <br /> vent piping. Single wall vent piping is not allowed. <br /> 2. G.0.2.1, Section (10) Stage II Vapor Recovery Piping Installation, indicates installation of <br /> single wall.fiberglass piping. Single wall vapor recovery piping is not allowed. <br /> 3. G.0.5, Section "Dispenser Sump Crossover Piping Detail for FRP" indicates single walled <br /> piping exiting the under dispenser containment. All piping must be double walled. <br /> 4. M.5.3.03, Buoyancy calculations are not signed by P.E. <br /> 5. M.5.3.05; Buoyancy calculations are not signed by P.E. <br /> If you have any further questions, please contact me at (209) 468-3453. <br /> Thank you, �— — <br /> Aaron Hang, EHS <br /> Environmental Health Specialist <br /> cc: Gupartarp Singh, Grin Investments, Inc., 62 N. Sierra Madre St., Mountain House, CA 95330 <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 T 209 468-3420 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.