My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aaron Hang <br /> Environmental Health Specialist <br /> San Joaquin County <br /> Environmental Health Department(EHD) -2- January 31, 2018 <br /> 3. G.0.5, Section 'Dispenser Sump Crossover Piping Detail for FRP" indicates single walled <br /> piping exiting the under dispenser containment. All piping must be double walled. <br /> Response: The section "Dispenser Sump Crossover Piping Detail for FRP" has been <br /> revised to reflect double-walled piping. <br /> 4. M.5.3.03, Buoyancy calculations are not signed by P.E. <br /> Response: The buoyancy calculations noted on Sheet M.5.3.03 are signed by a California <br /> Professional Engineer. <br /> 5. M.5.3.05, Buoyancy calculations are not signed by P.E. <br /> Response: The buoyancy calculations noted on Sheet M.5.3.05 are signed by a California <br /> Professional Engineer <br /> We believe that the responses above, together with the enclosed revised plans and technical documents, <br /> address all of the comments in your letter dated January 26, 2018. Please review and approve the <br /> enclosed documents at your earliest convenience. <br /> Should you have questions or need additional information, feel free to contact Ryan Bharucha at <br /> rbharucha@barghausen.com, or me at ainigues@barghausen.com, or either of us at (425) 251-6222. <br /> Thank you. <br /> Respectfully, <br /> M. Alexia Inigues <br /> Project Planner <br /> MAI/RB/mai <br /> 17866c.019.doc <br /> enc: As Noted <br /> cc: Gurpartap (Gary) Singh, Grin Investments, Inc. <br /> Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br /> Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br /> Joshua A. Harlan, Barghausen Consulting Engineers, Inc. <br /> Ryan Bharucha, Barghausen Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.