My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,Q_GHAv <br /> S1 CIVIL ENGINEERING,LAND PLANNING,SURVEYING <br /> P � <br /> a 2 <br /> 2 <br /> s� y, <br /> (T'NC'ENGN��p January 31, 2018 <br /> FedEx <br /> (209)468-3453 RECEIVED <br /> Aaron Hang FEB G 1 2018 <br /> Environmental Health Specialist <br /> San Joaquin County ENVIRONMENTAL HEALTH <br /> Environmental Health Department(EHD) PERMIT/SERVICES <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> RE: Responses to Comments— Permit Review SR0078036 <br /> ARCO ampm—New Facility <br /> 6009 North EI Dorado Street, Stockton, California 95207 <br /> ARCO Fac. No. TBD/Our Job No. 17866.2 <br /> Dear Aaron: <br /> Pursuant to your comment letter dated January 26, 2018. The following documents are enclosed for your <br /> review and approval: <br /> 1. One (1) copy of the response letter from the San Joaquin County Environmental Health <br /> Department dated January 26, 2018 <br /> 2. Three (3) sets of plans prepared by Barghausen Consulting Engineers, Inc. dated <br /> January 26, 2018-one (1) original set and two (2) scanned copies <br /> 3. Three (3)copies of the Fill Sump Cut Sheets <br /> a. Double-Wall Polygon Tank Sump, Model DW PTS (WT34)42/8(FV2/15/16)(AD) <br /> b. Double-Wall Polygon Tank Sump, Model DW PTS (WT40) 48/8 (FV2/15/16)(AD) <br /> The following outline provides each of your comments in italics exactly as written, along with a narrative <br /> response describing how each comment was addressed: <br /> PERMIT REVIEW SR0078036 <br /> Please provide the following additional information (three copies each) and address the following <br /> comments: <br /> 1. G.0.2.1, Section (9) Vent Piping Installation, indicates installation of single wall fiberglass vent <br /> piping. Single wall vent piping is not allowed. <br /> Response: The plans have been revised to reflect double-walled piping. <br /> 2. G.0.2.1, Section (10) Stage II Vapor Recovery Piping Installation, Indicates of single wall <br /> fiberglass piping. Single wall vapor recovery piping is not allowed. <br /> Response: The plans have been revised to reflect double-walled piping. <br /> 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 (425) 251-8782 FAX <br /> BRANCH OFFICES • TUMWATER, WA • LONG BEACH, CA • ROSEVILLE, CA • SAN DIEGO, CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.