My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6009
>
2300 - Underground Storage Tank Program
>
PR0542116
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 3:23:12 PM
Creation date
7/23/2020 1:45:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0542116
PE
2351
FACILITY_ID
FA0024188
FACILITY_NAME
GRIN INVESTMENTS INC DBA: ARCO AM/PM
STREET_NUMBER
6009
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
08126064
CURRENT_STATUS
01
SITE_LOCATION
6009 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
653
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�GHAV <br /> Sl CIVIL ENGINEERING,LAND PLANNING,SURVEYING <br /> 0] Z <br /> G Z <br /> s <br /> G�j'NG ENGEN �p February 22, 2018 RECEIVED <br /> E <br /> FedEx <br /> (209) 953-7699 FEB 2 6 2018 <br /> ENVIRONMENTAL HEALTH' <br /> Elena K. Manzo DEPARTMENT <br /> Lead Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, CA 95205-6232 <br /> RE: Responses to Comments—Permit Review SR0078036 <br /> ARCO ampm— New Facility <br /> 6009 North EI Dorado Street, Stockton, California 95207 <br /> ARCO Fac. No. TBD I Our Job No. 17866.2 <br /> Dear Elena: <br /> We have revised the plans and technical documents for the project referenced above in accordance with <br /> the outstanding issues in your comment email dated February 16, 2018. Enclosed are the following for <br /> your review and approval: <br /> 1) One (1) copy of the San Joaquin County Environmental Health Department comments dated <br /> January 26, 2018. <br /> 2) Three (3)sets of revised plans prepared by Barghausen Consulting Engineers, Inc., dated <br /> February 22, 2018. <br /> The following outline provides each of the comments in italics exactly as written, along with a narrative <br /> response describing how each comment was addressed: <br /> 1. G.0.2.0 Under General Notes, it states vapor recovery piping is either 2"inside 3"or 3"inside <br /> 4'. <br /> Response: The piping called out is correct. The larger diameters are for the main runs,which <br /> will narrow to the smaller diameter into the dispensers as depicted on the plans. <br /> 2. G.0.2.0#6 has same issue. <br /> Response: The piping called out is correct. The larger diameters are for the main runs,which <br /> will narrow to the smaller diameter into the dispensers as depicted on the plans. <br /> 3. G.0.2.0 in the Site Plan, indicates 5 times that the vapor recovery piping is single walled, and <br /> its 2"at furthest dispenser, and 3"downstream towards the tanks. <br /> Response: The five call-outs have been updated to indicate double-wall piping. <br /> 4. G.2.0.1 #10, has 2"to 3"vapor recovery <br /> 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 (425) 251-8782 FAX <br /> BRANCH OFFICES • TUMWATER, WA • LONG BEACH, CA • ROSEVILLE, CA • SAN DIEGO, CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.