Laserfiche WebLink
I. H. KLEINFELDER &ASSOCIATES <br /> - File: PW86-1041/14:381 <br /> July 29, 1986 <br /> € Page 8 <br /> IV. PROJECT COST <br /> An itemization of the project costs are presented below: <br /> PHASE I --- GROUND WATER MONITORING PROGRAM: COST ESTIMATE <br /> ACTIVITY COST <br /> Task 1 -- Well Installation, Development, <br /> ar,d Pump Test $ 4,870.00 <br /> Task 2 - - Sampling of Seven Monitoring Wells 950.00 <br /> Task 3 Supervision of Tank Removal and Disposal 270.00 <br /> Task 4 Project Management, Review, Preliminary <br /> Remedial System Design, and Final <br /> Report Preparation 3, 250.00 <br /> Subtotal Labor $ 9,340.00 <br /> EXPENSES <br /> Travel (Four round trips) $ 144.00 <br /> Publication, Reproduction, and uraphics 200.00 <br /> Telephone 15.00 <br /> Miscellaneous 10.00 <br /> MATERIALS <br /> Sand_-#3 280.00 <br /> - <br /> Concrete Groat 3,50.00. <br /> Bentonlf�e pellets 4:0.00 <br /> Security Covers 307.00 <br /> PVC Casing & End Caps $ 1,945.00 <br /> EQUIPMEIIT RENTAL <br /> Steam Cleaner 300.00 <br /> Generator (4 days L $55/day) 220.00 <br /> ! Pump Trailer (development, pump test, 2 days) 400.00 <br /> SUBCONTRACT SERVICES <br /> Drilling 1 $ 4.290.00 <br /> Lab Analyses (7 well samples, <br /> 1 blank, 1 dupe 1,800.00 <br /> Disposal Servi.e 480.00 <br /> Subtotal (Expenses, Materials, Equipment $11,184.00 v <br /> Rental, and Subcontract Work) � <br /> f ESTIMATED TOTAL20�524^00 <br /> — :` - -- - - -- 1.---Lsb -analyses: ---water-samples-analyzed..-for--be.nzene-,____to.l.ue...ne <br /> and xylene using EPA analytical Method 602. <br /> 2. Assuming tank does trot contain contaminated sludge or other <br /> toxic materials: <br />