Laserfiche WebLink
IV.QW <br /> K�• <br /> �. W. KLEINFELDER &ASSOCIATES <br /> File: PW86-1041/14:381 <br /> r July 29, 1986 <br /> Page 9 <br /> PHASE II -- VAPOR PHASE EXTRACTION SYSTEM DESIGN: COST ESTIMATE <br /> i ACTIVITY COST <br /> Task 1 $ 5,454.00 <br /> Task 2 13,824.00 <br /> Subtotal (Labor) $19,278.00 <br /> EXPENSES <br /> Travel $ 175.00 <br /> Publication and Reproduction 60.00 <br /> Telephone 20.00 <br /> Blueprints, Mylars 15.00 <br /> Miscellaneous 80.00 <br /> MATERIALS <br /> Sand 238.00 <br /> Gravel 175.00 <br /> Bentonite 375.00 <br /> Pressure Point Pie?ometer (3) 300.00 <br /> Pressure Transducer (3) 1,440.00 <br /> PVC 2-inch (Casing Screen, Caps, Plugs] (3) 536.00 <br /> PVC 4-inch (Casing Screen, Cap, Plug) 386.70 <br /> Christy Boxes 2-inch wells (3) 400.00 <br /> Mis�:ellaneous Supplies 100.00 <br /> (Sample Containers, Ice Bags, TSP, etc. ) <br /> SUBCONTRACT SERVICES <br /> Dr ilii ng 2,860.00 <br /> Lab Analyses 1,130.00 <br /> (t Steam Gleaner 150.00 <br /> !, Generator 110.00 <br /> , Subtotal (Expenses, Materials, Equipment $ 8,532.00 <br /> Rental, and Subcontract Work) <br /> REMEDIAL EQUIPMENT AND INSTALLATTONI <br /> Induction Draft Fan Equipment 1,400.00 <br /> Pressure Valve 150.00 <br /> Control Valve 225.00 <br /> Orifice Plate 110.00 <br /> f Sampling Ports 240.00 <br /> Labor <br /> Mechanical Engineering Contractor (24 hrs est. ) 1,152.00 <br /> # Suatotal (Remedial Equipment Lease/ $ 3,277.00 <br /> Purchase and Mechanical 1 <br /> Contractor Installation) <br /> r �- - ----- - ESTIMATED TOTAL S31y087_O0 <br /> 1 . Estimated equipment lease/purchase cost. <br /> i <br />