Laserfiche WebLink
I. H, KLEIN ELDER &ASSOCIATES <br /> 4'•i <br /> Once the elements of this work plan have been completed, an appropriate <br /> i <br /> ground water remediation system can be selected for the Guild Winery <br /> r facility. Detailed design and engineering of the selected remedial system <br /> will be required prior to construction of the treatment system. <br /> Completion of this Work Plan provides Guild Wineries with the confidence <br /> � = of selectipg the most appropriate and cost-effectivc ground water <br /> remediation program. <br /> !17 <br /> k � <br /> 1 <br /> !d� <br /> f,c <br /> 1y <br /> �ry <br /> 4r <br /> 33-87--887 2 <br />