My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012667
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WINEMASTERS
>
1
>
3500 - Local Oversight Program
>
PR0545907
>
ARCHIVED REPORTS_XR0012667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:09:52 PM
Creation date
7/23/2020 2:58:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012667
RECORD_ID
PR0545907
PE
3528
FACILITY_ID
FA0005259
FACILITY_NAME
GUILD WINERY
STREET_NUMBER
1
STREET_NAME
WINEMASTERS
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04908033
CURRENT_STATUS
02
SITE_LOCATION
1 WINEMASTERS WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lip <br /> !. H. KLEINFELDER & ASSOCIATES <br /> ,ts <br /> i .rte <br /> E� <br /> 3 SCOPR OF WORK <br /> pb <br /> The scope of work delineated in this work plan includes the overall tasks <br /> �.. of remedial alternative evaluation and detailed design, system evaluation, <br /> and budgetary cost estimates. Careful execution of these tasks is <br /> a cost-effective remedial action solution. The <br /> essential to developing <br /> t, <br /> twelve specific tanks addressed within the scope of work are: <br /> ` pr. <br /> o Ground water modeling <br /> a Ground water monitoring <br /> a Data management <br /> �..:. <br /> a siting of early warning/detection wells <br /> o Installation of early warning/detection wells <br /> o Remedial alternative screening <br /> f,. o Remedial alternative evaluation <br /> o Remedial alternative design <br /> o Remedial alternative construction and start-up <br /> o Reclaimed water and recovered waste disposition <br /> o Remediation technique performance assessment <br /> n, o permitting and regulatory liaison <br /> produce the <br /> The sequential execution of these tasks will be performed to p <br /> # ; <br /> necessary information in a building block process. That is to say that <br /> in a previous task will be integrated in <br /> the information/data learned <br /> maximize efficiency and minimize unnecessary <br /> sequential tasks to <br /> ' tF - <br /> expenditures. <br /> The specific activities that are related to each task are addressed below. <br /> �. 33-87-887 4 p <br />
The URL can be used to link to this page
Your browser does not support the video tag.