My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012667
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WINEMASTERS
>
1
>
3500 - Local Oversight Program
>
PR0545907
>
ARCHIVED REPORTS_XR0012667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:09:52 PM
Creation date
7/23/2020 2:58:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012667
RECORD_ID
PR0545907
PE
3528
FACILITY_ID
FA0005259
FACILITY_NAME
GUILD WINERY
STREET_NUMBER
1
STREET_NAME
WINEMASTERS
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04908033
CURRENT_STATUS
02
SITE_LOCATION
1 WINEMASTERS WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. , <br /> KLEINFELDER & ASSOCIATES <br /> o Major equipment jtypes with approximate capacities, sizes and <br /> ..K construction materials. <br /> Y, <br /> o Process flow sheets with mass balances. <br /> o Operational description of process units or other facilities, <br /> including general piping and instrumentation layouts. <br /> o Estimates of material or equipment quantities required. <br /> o A description of the structural concepts for any needed <br /> t facilities. <br /> : . o Identification of construction material requirements, other than <br /> equipment. <br /> o A general deocription of the utility requirements and the <br /> rationale for those needs. <br /> o An evaluation of potential construction problems, risks, and <br /> solutions. <br /> k <br /> o Right-of-wny requirements (if any). <br /> i <br /> o Identification of additional engineering data (if any) required <br /> to proceed with the design. <br /> o Performance standards to define levels of clean-up required to <br /> complete the remedial action. <br /> 3.9 REKEDIAL ALTERNATIVE CONSTRUCTION AND START-UP <br /> OBJECTIVE <br /> The objective is to implement the construction and start-up phases of the <br /> selected remedial treatment system. <br /> j <br /> 33-87--887 20 <br /> EM�o <br /> j <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.