Laserfiche WebLink
1 <br /> 1' <br /> j <br /> Table 1 <br /> Summary of Reports <br /> Guild Wineries and Distilleries <br /> One Winemasters' Way <br /> Lodi, California <br /> Title Date <br /> A i z i D rib d <br /> ary ofResUlts <br /> Soil and Ground Water December 16, 1985 -Installed B-1 through -TPH and BTX in water and soil, highest <br /> Assessment Report B-4, screen & analyze concentrations in B-1 and MW-1 <br /> soil samples -Pump Tests indicate production well <br /> --Installed MW-1 through doesn't affect shallow ground water <br /> MW-4 -Apparent ground water flow direction <br /> -Collect and analyze to the south <br /> water samples in August <br /> & November 1985 <br /> -Pump tests on Production <br /> Well <br /> Prcposal for Monitoring July 29, 1986 <br /> Well Installation, <br /> Ground Water Sampling, <br /> Analysis, ',Tank Disposal, <br /> and Vaporl,Phase <br /> Extraction System Design <br /> Soil Assessment Report March 18, 1986 Install B-5 through -TPH and BTX detected in soil, ? <br /> B-16 highest hydrocarbon concentrations in <br /> -Collected, screened, B-8 <br /> and analyzed soil samples <br /> Soil and Ground Water January 14, 1987 -Installed MW-5 through -BTX and TPH in ground water, highest <br /> Assessment Report, MW-7 concentrations in MW-1 <br /> Second Phase -All wells sampled in -Apparent ground water flow direction <br /> Scpterrbar 1986 to the south-southwest <br /> "Pump tEst Transmissivity of shallow zone approxi- <br /> mately 20,000 gpd/ft <br /> i <br /> . 113-88-914 - <br /> j <br />