Laserfiche WebLink
first and second canister Each carbon cani,,tei has been fitted with a <br /> sample port which allows a sample to be collected and analyzed at <br /> prescribed intervals to determine at what point 1 ,2-DCA has broken <br /> through the first canister ASE will replace the canisters when they no <br /> longer are effective at removing the 1,2-DCA from the water The system <br /> has been designed to always have an adequate supply of activated carbon <br /> in one vessel to treat a normal volume of water while the other canister is <br /> spent and in the pioce55 of being replaced Currently, the schedule foi <br /> sample collection and analysis is quarterly (every 3 months) <br /> WATER SAMPLE COLLECTION, ANALYSIS AND RESULTS <br /> On October 30, 2001, a water sample, labeled 17717 Airport Way, was <br /> collected from the well during routine quarterly sample collection <br /> activities The sample was placed within an ice chest containing wet ice <br /> while transported to Kiff Analytical of Davis, California (FLAP# 2 2 3 6) <br /> under chain of custody procedures The sample was analyzed for total <br /> petroleum hydrocarbons as gasoline (TPH-G), benzene, toluene, <br /> ethylbenzene, and xylenes (collectively known as BTEX), the five fuel <br /> oxygenates, and lead scavengers by EPA Method 8260B The sample <br /> contained 082 parts per billion (ppb) 1,2-DCA <br /> After the system was installed, started, and operating in mid-Decem <br /> P g bei, <br /> 2001, ASE collected a water sample after treatment by the first carbon <br /> canister This sample was labeled 17717-GAC1-12 14 01 The sample was <br /> placed within an ice chest containing wet ice while transported to Kiff <br /> under chain of custody procedures The sample was analyzed for TPH-G, <br /> BTEX, five fuel oxygenates, and lead scavengers by EPA Method 8260B <br /> The sample contained no detectable concentrations of 1,2-DCA <br /> The sample did however contain very low concentrations of compounds in <br /> the gasoline range (79 ppb) that are common components in PVC pipe <br /> glue A majority of the treatment system is made up of newly installed <br /> and glued PVC pipe These compounds will no longer exist after several <br /> hundred gallons of water are flushed through the newly installed piping <br /> and the glue has permanently set A copy of the certified analytical <br /> reports are attached in Appendix B <br /> The Aeropure Water alternative water supply was disconnected from the <br /> • plumbing system after the system's performance was evaluated and found <br /> to be operating as designed <br /> -2- <br />