Laserfiche WebLink
i <br /> I TASK 8 - PREPARE A SUBSURFACE ASSESSMENT REPORT <br /> IASE will prepare a subsurface assessment report outlining the methods <br /> and findings of this assessment This report will include a summary of the <br /> results, the site background and history, description of the well <br /> construction, development and sampling, tabulated analytical results, <br /> potentiometric surface maps, isoconcentrattons maps, conclusions a n d <br /> I recommendations Analytical reports and chain of custody <br /> documentation will be included as appendices This report will b e <br /> submitted under the seal of a California registered civil engineer o r <br /> geologist <br /> 4 . 0 SCHEDULE <br /> ASE will begin the process of obtaining permits and access agreements to <br /> install the wells immediately upon approval of this workplan The report <br /> will be submitted to the RWQCB no later than February 1, 2004 <br /> Should you have any questions or comments, please call us at (925) 820- <br /> 9391 <br /> Respectfully submitted, <br /> AQUA SCIENCE ENGINEERS, INC <br /> David Allen,Allen, R E A aED GF�� <br /> Senior Project Manager �� ��►� �c� <br /> l' � I dn <br /> Robert E Kitay, G , R E A 9TFOF CAL'1 � <br /> Senior Geologist <br /> Frank's One Stop Workplan — September 2003 <br /> -17- <br />