My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003674
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
ARCHIVED REPORTS_XR0003674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:37:10 PM
Creation date
7/23/2020 4:07:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003674
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT ORDER NO R5-2003-0713 7 <br /> FRANK and SHERRI GUINTA, dba GUINTA ENTERPRISES <br /> JAMES and MARILYN RAMSEY, <br /> 2072 WEST YOSEMITE AVENUE <br /> MANTECA, SAN JOAQUIN COUNTY <br /> Additional Groundwater Characterization <br /> 7 By 15 September 2003, submit a Workplan to complete the delineation of the lateral and vertical <br /> extent of pollution. The Woi kplan must evaluate and propose additional offsite monitoring wells <br />' in shallow (first water), middle (30 to 60 feet bgs), and deep (over 125 feet bgs) water-beanng <br /> zones to verify groundwater pollution identified in Report Of Delineation Of Extent of <br /> Containlnation North Of The Site, dated 21 March 2000 (see Figure 3) Domestic wells are not <br />' adequate substitutes for properly constructed monitoring wells for delineation of groundwater <br /> pollution <br />' 8 By 1 February 2004, submit an Additional Site Characterization Report providing information <br /> from the implementation of the approved Workplan assessing the vertical and lateral extent of the <br /> groundwater pollution in all impacted aquifer zones <br /> I <br /> Final Remedial Actions <br />' 9 By 1 April 2004, submit a Final Corrective Action Plan (Plan) The Plan must include a <br /> description of the preferred remedial actions to address cleanup of the entire groundwater plume <br /> and source area soils The Plan may include optimization of the existing soil vapor extraction & <br /> air sparging, systems and include any additional remedial actions necessary to abate the effects of <br /> the Dischargers' release The Plan shall also include a schedule to implement all final remedial <br /> actions <br /> 10 Within 60 days of Executive Officer approval of the Final Corrective Action Plan, the Dischargers <br /> shall implement the approved remedial actions The Discharger shall notify staff a minimum of <br /> three working days prior to beginning fieldwork <br />' 11 Within 120 days of Executive Officer approval of the Final Corrective Action Plan, submit a <br /> report describing the status and results of the cleanup work (Cleanup Implementation Report) <br /> Report status of the installation of a cleanup system as complete, and if not, provide a schedule and <br /> proposed work plan for installing the remaining cleanup system(s), including a proposed <br /> monitoring plan <br /> 12 Upon startup of any remediation system(s), operate the remediation system(s) continuously, except <br /> for scheduled periodic maintenance or unpreventable equipment failure The Dischargers shall <br /> notify the Regional Board within 24 hours, if any unscheduled shutdown of the remediation <br /> system(s) lasts longer than 48 hours This notification shall include the cause of the shutdown and <br /> the corrective action taken (or proposed to be taken) to restart the system and assure the problem <br /> will not reoccur Any interruptions in the operation of the remediation system(s), other than for <br /> scheduled maintenance, emergencies, or equipment failure, without prior knowledge by Regional <br /> MBoard staff or without notifying the Regional Board within the specified time, is a violation of this <br /> Order <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.