My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 mgd ADWF (approximately 174%). Therefore,the proposed project would increase electricity demand to <br /> approximately 47,638 kWh per day(or 1,984 kW per day), and natural gas demand to approximately <br /> 74.25 therms per day. <br /> Implementation of the proposed project would increase energy demands within the city. However,the energy <br /> demands created by the project are not substantial in relation to the total energy supplied by PG&E in its northern <br /> and central California service area(estimated in 2005 to be 81,626 million kWh per day of electricity and 844,068 <br /> million cubic feet per day of natural gas) or total energy demands expected in the future. The on-site service lines <br /> would be sized to meet the demands of the project, and public utility easements would be dedicated for all <br /> underground facilities as necessary. Extension of on-site utility lines and construction of facilities to serve the <br /> project would occur concurrently with development at the WQCF.All new infrastructure would be installed <br /> underground, in conformance with City standards(Policy PF-I-17). <br /> Because the energy demands created by the project would not be substantial in relation to the total energy <br /> supplied by PG&E in its northern and central California service area or total energy demands expected in the <br /> future,and because proposed energy improvements would be required to comply with existing City,PG&E, and <br /> applicable Uniform Building Code requirements,the proposed project would result in less-than-significant <br /> electricity and natural gas impacts. <br /> IMPACT Public Services and Utilities—Increased Demand for Fire Protection and Police Services. <br /> 4.10-4 Implementation of the proposed project would not require additional fire protection or police services. <br /> The City of Manteca police and fire departments would be able to serve the project and meet established <br /> performance standards. Therefore, the project's impacts on fire protection and police services would be <br /> less than significant. <br /> The closest fire station to the WQCF site is Fire Station 242, located at 1154 South Union Road, immediately <br /> north of SR 120 on Union Road, approximately 1.5 miles east of the WQCF site. Two other fire stations, Station <br /> 241 at 290 South Powers Avenue and Station 243 at 399 West Louise Avenue, could provide backup in an <br /> emergency. The Manteca Fire Department would be able to serve the proposed project without constructing new <br /> facilities or hiring additional personnel(Quaresma,pers. comm., 2006). Therefore,the project would be <br /> consistent with City policies related to adequate staffing to maintain minimum feasible fire and emergency call <br /> response times (Policy PF-P-43). <br /> Police services would be provided to the proposed project area by the Manteca Police Department,which is <br /> composed of more than 70 sworn staff, 30 civilian support staff, and more than 200 volunteers. The police <br /> department is located approximately 1.5 miles east of the WQCF site. The Manteca Police Department would <br /> have sufficient staff to serve the proposed project while maintaining acceptable response times(Halford,pers. <br /> comm.,2006). Therefore,the project would be consistent with City policies related to adequate staffing to <br /> maintain minimum feasible police response times (Policy PF-P-39). <br /> Because implementation of the proposed project would not require additional fire protection or police services <br /> and established performance standards could be met,this impact would be less than significant. <br /> IMPACT Public Services and Utilities—Impacts on Existing Utility Corridors. Implementation of the proposed <br /> 4.10-5 project could potentially disrupt existing aboveground and underground utility facilities in the project area, <br /> resulting in interruption of service. This would be a potentially significant impact. <br /> Implementation of the proposed project could potentially disrupt existing aboveground and underground utility <br /> facilities in the project area, including a PG&E high-voltage electrical transmission line crossing the WQCF <br /> property 400 feet south of existing developed areas at the WQCF, and overhead electrical transmission lines along <br /> the proposed alignment of the treated-effluent outfall pipeline. Implementation of the proposed project may <br /> require that high-voltage electrical transmission towers and other electrical transmission facilities be moved to <br /> EDAW Manteca WQCF and Collection System Master Plans EIR <br /> Public Services and Utilities 4.10-8 City of Manteca <br />
The URL can be used to link to this page
Your browser does not support the video tag.