Laserfiche WebLink
Page: 3 Page: 4 <br /> 04/20/2007 4:44 PM 04/20/2007 4:44 PM <br /> Phase 1 - Demolition Assumptions: Phase Turned OFF Changes made to the default values for Land Use Trip Percentages <br /> Phase2 - Site Grading Assumptions <br /> Start Month/Year for Phase 2: Jun '08 Changes made to the default values for Construction <br /> Phase 2 Duration: 2 months <br /> On-Road Truck Travel (VMT): 46 The user has overridden the Default Phase Lengths <br /> Off-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day <br /> 1 Crawler Tractors 143 0.575 8.0 <br /> 0 Graders 174 0.575 8.0 <br /> 0 Off Highway Trucks 417 0.490 8.0 <br /> 0 Rubber Tired Loaders 165 0.4fi5 8.0 <br /> 0 Scrapers 313 0.6fi0 8.0 <br /> 0 Tractor/Loaders/Backhoe. 79 0.465 8.0 <br /> Phase3 -Building Construction Assumptions <br /> Start Month/Year for Phase 3: Aug '08 <br /> Phase 3 Duration: 10 months <br /> Start Month/Year for SubPhase Building: Aug '08 <br /> SubPhase Building Duration: 10 months <br /> Off-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day <br /> 0 Other Equipment 190 0.620 8.0 <br /> SubPhase Architectural Coatings Turned OFF <br /> SubPhase Asphalt Turned OFF <br />