My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page: 3 Page: 4 <br /> 04/20/2007 4:44 PM 04/20/2007 4:44 PM <br /> Phase 1 - Demolition Assumptions: Phase Turned OFF Changes made to the default values for Land Use Trip Percentages <br /> Phase2 - Site Grading Assumptions <br /> Start Month/Year for Phase 2: Jun '08 Changes made to the default values for Construction <br /> Phase 2 Duration: 2 months <br /> On-Road Truck Travel (VMT): 46 The user has overridden the Default Phase Lengths <br /> Off-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day <br /> 1 Crawler Tractors 143 0.575 8.0 <br /> 0 Graders 174 0.575 8.0 <br /> 0 Off Highway Trucks 417 0.490 8.0 <br /> 0 Rubber Tired Loaders 165 0.4fi5 8.0 <br /> 0 Scrapers 313 0.6fi0 8.0 <br /> 0 Tractor/Loaders/Backhoe. 79 0.465 8.0 <br /> Phase3 -Building Construction Assumptions <br /> Start Month/Year for Phase 3: Aug '08 <br /> Phase 3 Duration: 10 months <br /> Start Month/Year for SubPhase Building: Aug '08 <br /> SubPhase Building Duration: 10 months <br /> Off-Road Equipment <br /> No. Type Horsepower Load Factor Hours/Day <br /> 0 Other Equipment 190 0.620 8.0 <br /> SubPhase Architectural Coatings Turned OFF <br /> SubPhase Asphalt Turned OFF <br />
The URL can be used to link to this page
Your browser does not support the video tag.