Laserfiche WebLink
Page: 1 Page: 2 <br /> 04/20/2007 4:52 PM 04/20/2007 4:52 PM <br /> URBEMIS 2002 For Windows 8.7.0 URBEMIS 2002 For Windows 8.7.0 <br /> File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Long File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca Long <br /> Project Name: Manteca Long Grading Yr 1 Project Name: Manteca Long Grading Yr 1 <br /> Project Location: San Joaquin Valley Project Location: San Joaquin Valley <br /> On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 <br /> SUMMARY REPORT DETAIL REPORT <br /> (Tons/Year) (Tons/Year) <br /> CONSTRUCTION EMISSION ESTIMATES Construction Start Month and Year: June, 2008 <br /> PM10 PM10 PM10 Construction Duration: 12 <br /> *** 2008 *** ROG NOx CO S02 TOTAL EXHAUST DUST Total Land Use Area to be Developed: 31 acres <br /> TOTALS (tpy, unmitigated) 0.48 3.46 3.90 0.00 0.29 0.14 0.15 Maximum Acreage Disturbed Per Day: 0.2 acres <br /> Single Family Units: 0 Multi-Family Units: <br /> Retail/Office/Institutional/Industrial Square Footage: 5000 <br /> PM10 PM10 PM10 <br /> *** 2009 *** ROG N CO S02 TOTAL EXHAUST DUST CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (tons/year) <br /> TOTALS (tpy, unmitigated) 0.35 2.36 2.86 0.00 0.20 0.09 0.11 PM10 PM10 PM10 <br /> Source ROG NOx CO S02 TOTAL EXHAUST DUST <br /> *** 2008*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0-11 - <br /> 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total to /year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.15 - 0.15 <br /> Off-Road Diesel 0.46 3.23 3.59 - 0.13 0.13 0.00 <br /> On-Road Diesel 0.010.22 0.05 0.00 0.01 0.01 0.00 <br /> Worker Trips 0.01 0.01 0.26 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.48 3.46 3.90 0.00 0.29 0.14 0.15 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off_Gas 0.00 - - - - - - <br /> Arch Coatings We <br /> Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total all phases tons/yr 0.48 3.46 3.90 0.00 0.29 0.14 0.15 <br /> *** 2009*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/yeas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.11 - 0.11 <br /> Off-Road Diesel 0.33 2.20 2.64 - 0.09 0.09 0.00 <br /> On-Road Diesel 0.01 0.15 0.03 0.00 0.00 0.00 0.00 <br /> Worker Trips0.01 0.01 0.19 0.00 0.00 0.00 0.00 <br /> Total to 0.35 2.36 2.86 0.00 0.20 0.09 0.11 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total all phases tons/yr 0.35 2.36 2.86 0.00 0.20 0.09 0.11 <br />