Laserfiche WebLink
Page: 3 Page: 1 <br /> 04/20/2007 6:11 PM 04/20/2007 6:14 PM <br /> Phase 2 - Site Grading Assumptions: Phase Turned OFF URBEMIS 2002 For Windows 8.7.0 <br /> File Name: C:\Documents and Settings\Rurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca WOOF <br /> Phase3 -Building Construction Assumptions Project Name: Manteca WOOF Phase 2 Year 1 <br /> Start Month/Year for Phase 3: Jun '08 Project Location: San Joaquin Valley <br /> Phase 3 Duration: 9 months On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 <br /> SubPhase Building Turned OFF <br /> Sub Phase Architectural Coatings Turned OFF SUMMARY REPORT <br /> Start Month/Year for SubPhase Asphalt: Jun '08 (Tons/Year) <br /> SubPhase Asphalt Duration: 9 months <br /> Acres to be Paved: 10.6 CONSTRUCTION EMISSION ESTIMATES <br /> Off-Road Equipment PM10 PM10 PM10 <br /> No. Type Horsepower Load Factor Hours/Day *** 2018 *** ROG NOx CO S02 TOTAL EXHAUST DUST <br /> 1 Pavers 132 0.590 1.5 TOTALS (tpy, unmitigated) 0.12 0.75 1.02 0.00 0.31 0.03 0.28 <br /> 1 Rollers 114 0.430 1.5 TOTALS (tpy, mitigated) 0.12 0.75 1.02 0.00 0.31 0.03 0.28 <br /> PM10 PM10 PM10 <br /> *** 2019 *** ROG NOx CO S02 TOTAL EXHAUST DUST <br /> TOTALS (tpy, unmitigated) 0.09 0.28 0.37 0.00 0.01 0.01 0.00 <br /> TOTALS (tpy, mitigated) 0.09 0.28 0.37 0.00 0.01 0.01 0.00 <br />