My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page: 2 Page: 3 <br /> 04/20/2007 6:14 PM 04/20/2007 6:14 PM <br /> URBEMIS 2002 For Windows 8.7.0 Phase 1 - Demolition Assumptions: Phase Turned OFF <br /> File Name: C:\Documents and Settings\Kurtzj\My Documents\Active\SAC\Manteca\Manteca AQ\Urbemis\Manteca WQCF Phase 2 - Site Grading Assumptions <br /> Project Name: Manteca WAIF Phase 2 Year 1 Start Month/Year for Phase 2: Jun '18 <br /> Project Location: San Joaquin Valley Phase 2 Duration: 2 months <br /> On-Road Motor Vehicle Emissions Based on EMFAC2002 version 2.2 On-Road Truck Travel (VMT): 46 <br /> Off-Road Equipment <br /> DETAIL REPORT No. Type Horsepower Load Factor Hours/Day <br /> (Tons/Year) 1 Crawler Tractors 143 0.575 8.0 <br /> 0 Graders 174 0.575 8.0 <br /> Construction Start Month and Year: June, 2018 0 Off Highway Trucks 417 0.490 8.0 <br /> Construction Duration: 12 0 Rubber Tired Loaders 165 0.465 8.0 <br /> Total Land Use Area to be Developed: 5 a 0 Scrapers 313 0.660 8.0 <br /> Maximum Acreage Disturbed Per Day: 1.25 a 0 Tractor/Loaders/Backhoe. 79 0.465 8.0 <br /> Single Family Units: 0 Multi-Family Units: Os <br /> Retail/Office/Institutional/Industrial Square Footage: 15000 Phase3 -Building Construction Assumptions <br /> Start Month/Year for Phase 3: Aug '18 <br /> CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (tons/year) Phase 3 Duration: 10 months <br /> P 1 PM10 2 1 Start Month/Year for Sub Phase Building: Aug '18 <br /> Source ROG NOx CO S02 TOTAL EXHAUST DUST Sub Phase Building Duration: 10 months <br /> *** 2018*** Off-Road Equipment <br /> Phase 1 - Demolition Emissions No. Type Horsepower Load Factor Hours/Day <br /> Fugitive Dust - - - - 0.00 - 0.00 0 Other Equipment 190 0.620 8.0 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 Sub Ph ase Architectural Coatings Turned OFF <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Sub Phase Asphalt Turned OFF <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.28 - 0.28 <br /> Off-Road Diesel 0.08 0.46 0.64 - 0.02 0.02 0.00 <br /> On-Road Diesel 0.00 0.01 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.01 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.08 0.47 0.65 0.00 0.30 0.02 0.28 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel 0.04 0.26 0.36 - 0.01 0.01 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.01 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> A.phalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.04 0.28 0.37 0.00 0.01 0.01 0.00 <br /> Total all phases tons/yr 0.12 0.75 1.02 0.00 0.31 0.03 0.28 <br /> *** 2019*** <br /> Phase 1 - Demolition Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0,of 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 2 - Site Grading Emissions <br /> Fugitive Dust - - - - 0.00 - 0.00 <br /> Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total tons/year 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Phase 3 -Building Construction <br /> Bldg Const Off-Road Diesel o.U4 0.28 0.36 - 0.01 0.01 0.00 <br /> Bldg Const Worker Trips 0.00 0.00 0.01 0.00 0.00 0.00 0.00 <br /> Arch Coatings Off-Gas 0.00 - - - - - - <br /> Arch Coatings Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Off-Gas 0.00 - - - - - - <br /> Asphalt Off-Road Diesel 0.00 0.00 0.00 - 0.00 0.00 0.00 <br /> Asphalt On-Road Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Asphalt Worker Trips 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br /> Total to 0.04 0.28 0.37 0.00 0.01 0.01 0.00 <br /> Total all phases tons/yr 0.04 0.28 0.37 0.00 0.01 0.01 0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.