Laserfiche WebLink
28 December 2018 AdvancedGeo <br />AGE Project No. 18-4574 Environmental <br />Page 11 of 12 <br />5.2. SPECIFIC REMEDIATION OR REMOVAL METHOD TO BE USED IN EACH <br />AREA <br />The residence will be sampled prior to proposing a method of remediation. If waste <br />disposal is recommended, bins used for containing waste will have covers that can be <br />attached or built onto bins for complete covering of bins during transport. <br />5.3. HANDLING, STORAGE, TRANSPORTATION AND DISPOSAL <br />Waste will only be handled by appropriately trained personnel. Securely covered bins will <br />be transported by appropriately licensed waste haulers to an EHD approved waste <br />disposal facility. A manifest will be included with the PSAR indicating the transport of <br />waste and location of waste disposal facility. <br />6.0. CERTIFICATION AND QUALIFICATION <br />Only authorized individuals will review or conduct work activity at the site. <br />6.1. CERTIFICATION <br />This PSAWP has been reviewed and certified by a certified industrial hygienist. <br />6.2. QUALIFICATION <br />AGE representatives are qualified to enter the site in accordance with EHD requirements. <br />CCR Title 8 certifications are included as Appendix B. <br />6.3. DISCLOSURE <br />Disclosure for work is provided by this report to EHD. <br />6.3.1. EHD Notification <br />This report and any other pertinent information, as required by EHD regulations, will be <br />provided to EHD for review. Once this report is approved, EHD will be notified (by email, <br />voice message or fax) within 48 hours of start of work discussed in this report. Work <br />discussed in this report will be coordinated with the remediation contractor to start and <br />coincide with the notification date given to EHD. <br />